Selkirk SuperVent 2100 Installation Instructions & Maintenance Manual

Selkirk SuperVent 2100 Installation Instructions & Maintenance Manual

650 deg factory built insulated chimney
Hide thumbs Also See for SuperVent 2100:
Table of Contents

Advertisement

Available languages

Available languages

&
SUPERVENT 2100 (SC-1)
SUPERPRO 2100 (ALT)
650°C FACTORY BUILT
INSULATED CHIMNEY
LISTED
SELKIRK CANADA CORPORATION
950 South Service road, Second Floor
Stoney Creek, ON L8E 6A2
1.888.SELKIRK(735.5475)
02/12/21
& & & & &
Tested to Standards
CAN/ULC-S629
&
UL 103 Type HT
A MAJOR CAUSE OF VENT
RELATED FIRES IS FAILURE TO
MAINTAIN REQUIRED
CLEARANCES (AIR SPACES) TO
COMBUSTIBLE MATERIALS.
IT IS OF THE UTMOST
IMPORTANCE THAT THIS
CHIMNEY SYSTEM BE
INSTALLED ONLY IN
ACCORDANCE WITH THESE
INSTRUCTIONS.
PLEASE READ ALL INSTRUCTIONS
BEFORE BEGINNING YOUR
INSTALLATION.
FAILURE TO INSTALL THIS SYSTEM IN
ACCORDANCE WITH THESE
INSTRUCTIONS WILL VOID THE
CONDITIONS OF CERTIFICATION AND
THE MANUFACTURER'S WARRANTY.
Installer: It is of the utmost importance
that these instructions are left with the
homeowner.
Homeowner: Keep these instructions and
maintenance guide in a safe place for
future reference.
1
I
I
NSTALLATION
NSTRUCTIONS
&
M
G
AINTENANCE
UIDE
(C
& U
S
ANADA
NITED
SELKIRK CORPORATION
5030 Corporate Exchange Blvd. SE,
Grand Rapids, MI 49512
1.800.992.VENT (8368)
)
TATES
3010440

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperVent 2100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Selkirk SuperVent 2100

  • Page 1 TATES & A MAJOR CAUSE OF VENT & & & & & RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED SUPERVENT 2100 (SC-1) CLEARANCES (AIR SPACES) TO SUPERPRO 2100 (ALT) COMBUSTIBLE MATERIALS. 650°C FACTORY BUILT INSULATED CHIMNEY IT IS OF THE UTMOST...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS CERTIFICATION LABELS TYPE OF APPLIANCES PRE INSTALLATION GUIDELINES 4, 5 TOOLS FRAMING DETAILS CEILING SUPPORT INSTALLATION 5, 6 STOVE PIPE ADAPTOR ATTIC INSULATION SHIELD INST ALLATION 6, 7 ELBOW INSTALLATION WALL SUPPORT INSTALLATION (AWS) 8, 9 INTERMEDIATE WALL SUPPORT (AIWS) WALL SUPPORT INSTALLATION (WS) 9, 10, 11, 12 WALL BAND...
  • Page 3: Certification Labels

    CERTIFICATION LABELS...
  • Page 4: Type Of Appliances

    BETWEEN INSULATED CHIMNEY SECTIONS AND COMBUSTIBLE MATERIALS OR AS ESTABLISHED BY SUPPORT ASSEMBLY. Model SuperVent 2100/SuperPro 2100 chimney has been tested per CAN/ULC-S629 as an all fuel chimney. As such it is code approved WARNING: DO NOT PLACE ANY INSULATING MATERIALS OR...
  • Page 5: Tools

    (200mm) 365 x 365 365 x 365 405 x 405 Selkirk's Models JM/ALT listed components. * The clearance to combustibles obtained with a correctly installed Decorator Ceiling Support or Wall Thimble in the framed opening CHIMNEY SIZING: specified has been tested. The 2" clearance does not apply at these In order to achieve safe, optimum performance of the appliance, locations.
  • Page 6 The exception to this is a double wall stove pipe, such as For a proper installation, the opening must be fully framed at Selkirk's Model DSP which can be installed at reduced clearances to 2 inches of clearance to the ouside casing of the chimney with combustibles.
  • Page 7: Elbow Installation

    ELBOW INSTALLATION When installing the Attic Insulation Shield above the Decorator Ceiling Support as shown in Figure 5, be certain that the base of the One pair of (two) 15 or 30 elbows may be used in an interior shield is flush with the top of the joist framing and nail in place using installation to provide an offset in order to avoid cutting of joists and 1”...
  • Page 8: Wall Support Installation (Aws)

    Determine the center line of the horizontal connection (length through WALL SUPPORT (AWS) - 2-1/2" only the wall) and frame an opening to the dimensions specified in the As previously mentioned, the ideal location for your chimney system Framing Dimension Table 1. (For non-combustible walls (concrete is within the building envelope.
  • Page 9 WALL SUPPORT (WS) - Adjustable up to 6" NOTE: Ensure that you have set aside the Tee Plug, if not, do so now as you will require it later. from a vertical wall (sold separately) From outside the building, slide the chimney length (previously As previously mentioned, the ideal location for your chimney system installed on the tee branch) through the Wall Thimble ensuring the is within the building envelope.
  • Page 10 The following steps will assist you in the installation of the Wall Black Telescoping adjustment from Thimble and of the Wall Support. Figure 11 shows a typical Wall Finishing 4-1/2” to 8-3/4” Support installation through a combustible wall. Round Plate Table 2 - W all Support Distance Chimney Height Chart...
  • Page 11 METHOD B Slot for Tee Cap Bracket Support Position the Wall Support so that the Insulated Tee will be Support Bracket Plate Threaded Stud centered inside the Wall Thimble. Ensure that the Wall Support is level, and secure to the wall through the pre-punched holes located on the sides of each of the support brackets using (8) #14 x 1-1/2"...
  • Page 12: Wall Band

    ° 14. Use a non-hardening high-temperature sealant (500 F) to seal 16. Chimney Lengths above the Insulated Tee are simply stacked around the horizontal Chimney Length where it enters through the on and locked with a 1/8 clockwise turn. exterior of the Wall Thimble or the concrete wall. 15.
  • Page 13: Cathedral Ceiling Support Installation

    ROOF SUPPORT (RS) The Cathedral Ceiling Support will support a total of 18 ft. (5.5m), of chimney sections. Chimney joints made below the support must be The Roof Support, may be used on a floor, ceiling or roof and adjusts secured with locking bands.
  • Page 14: Roof Flashing Installation

    the ends together loosely with the nut and bolt supplied. Apply a Insulation Shield (AIS) and the chimney has been enclosed with an non-hardening high temperature silicone caulking just above the top enclosure around the chimney. of the flashing cone on the chimney outer shell. Slide the collar down Attach the support brackets to the shield (through one of the three the chimney until it contacts the flashing cone and into the caulking.
  • Page 15 UNIVERSAL ROOF GUY KIT (JURGK-1) Assembly of Support Band: If the chimney extends 5 ft. (1600 mm) or more above the roof deck, roof guys Elevator Support Band are required. The Roof Guy Kit will provide lateral support to the chimney Bolt Halves above the roof line.
  • Page 16: Roof Guy Kit Installation

    H. Attach the other end of each telescoping leg assembly to an Angle Bracket J. Make sure the chimney is level and plumb. Check all required dimensions using one (1) 1/4-20 X 1” bolt and nut (see Figure 34). and angles, adjust if necessary. For added security, lock legs in place by using 1/8”...
  • Page 17 It is important to load your appliance properly and to you line the clay tile with a chimney liner (Selkirk's Stainless Steel avoid smoldering fires. By doing so, it reduces creosote formation Liner) that is listed for existing masonry chimneys, or continue and the risk of chimney fires.
  • Page 18: Adapter Plate

    ADAPTER PLATE (AP) - MASONRY FIREPLACE WARNING: The Adapter Plate (AP) is intended for use with a masonry fireplace DO NOT USE FUEL MATERIALS CORROSIVE TO THE with model JM/ALT chimney. The Adapter Plate (AP) provides a CHIMNEY LINER SUCH AS DRIFTWOOD, PLASTICS, connection from a masonry fireplace to Model JM/ALT insulated CHEMICALLY TREATED WOOD, ETC.
  • Page 19: Replacement Parts List

    "LISTED" FACTORY-BUILT FIREPLACE REPLACEMENT PARTS LIST When Selkirk chimney Model JM/ALT is approved with a "Listed" factory-built fireplace, the chimney and fireplace are tested in combi- SUPERPRO SUPERVENT nation as a complete system and the fireplace instructions must be 2100 2100 followed.
  • Page 20: Chart 1 - Offset Chimney Installation

    CHART 1 - OFFSET CHIMNEY INSTALLATION It may be necessary to offset the chimney in order to clear a joist or an obstacle. The two (2) charts below will assist you i n selecting the proper combination of elbow angle and chimney length(s) that will provide the necessary degree of offset within an available height. 1.
  • Page 21: Chart 2 - Chimney Height Above The Roof

    CHART 3 - Connector Pipe Clearance below Cathedral Support 1. Identify the type of connector pipe you will be installing, single wall or Selkirk's Double Wall Stove Pipe (DSP). 2. Determine the amount of the exposed Cathedral Support that will be projecting into the room as per the "X" in the diagram o n the bottom left.
  • Page 22: Installation Information

    INSTALLATION INFORMATION INSTALLATION INFORMATION Leave with homeowner. Homeowner: Keep in a safe place for future reference. PRODUCT INFO CHIMNEY MODEL : SuperVent 2100 / SuperPro 2100 FLUE SIZE________ TOTAL HEIGHT_________ INSIDE INSTALLATION OUTSIDE INST A LLATION CONNECTED TO (type of appliance):...
  • Page 23 ANADA TATS & UNE DES CAUSES PRINCIPALES & & & & & D’INCENDIES DE CHEMINÉES EST LE FAIT DE NE PAS SUPERVENT 2100 (SC-1) MAINTENIR LE DÉGAGEMENT SUPERPRO 2100 (ALT) REQUIS (ESPACES D’AIR) AUX CHEMINÉE ISOLÉE MATÉRIAUX COMBUSTIBLES PRÉFABRIQUÉE 650...
  • Page 24 TABLE DES MA TIÈRES ÉTIQUETTES DE CER TIFICATION TYPES D’APPAREILS DIRECTIVES AVANT L’INSTALLATION 4, 5 OUTILS DÉTAILS DE LA STRUCTURE INSTALLATION DU SUPPORT DE PLAFOND DÉCORA TIF 5, 6 INSTALLATION DU TUYAU DE POÊLE INSTALLATION DU PARE-FEU POUR LE GRENIER 6, 7 INSTALLATION DU COUDE INSTALLATION DU SUPPOR T MURAL (AWS)
  • Page 25: Étiquettes De Certification

    ÉTIQUETTES DE CERTIFICATION...
  • Page 26: Types D'appareils

    MAINTENIR UN DÉGAGEMENT MINIMUM DE 2 PO. (50MM) D'ESPACE D'AIR ENTRE LES SECTIONS DE CHEMINÉE La cheminée SuperVent 2100/SuperPro 2100 a été testée conformément ISOLÉE ET LES MATÉRIAUX COMBUSTIBLES à CAN/ULC-S629 en tant de cheminée à tout combustible. En tant que tel, elle est approuvée par la norme pour le raccordement à...
  • Page 27: Outils

    14 16 x 16 8" uniquement les composants répertoriés dans les modèles JM/ALT de (200mm) Selkirk. 365 x 365 365 x 365 405 x 405 * Le dégagement aux matériaux combustibles obtenu grâce à un DIMENSION DE LA CHEMINÉE support de plafond décoratif ou une bague murale correctement...
  • Page 28 18 po. aux combustibles doit être maintenu pour un tuyau de raccordement. Il existe une exception à ceci, il s'agit du tuyau de poêle à double parois "DSP" de Selkirk Pour une installation adéquate, encadrer une ouverture carrée (quatre qui peut être installé...
  • Page 29: Installation Du Coude

    Lorsque vous installez le pare-feu pour le grenier au-dessus du support INSTALLATION DES COUDES de plafond décoratif, tel que démontré au schéma 5, assurez-vous que la Une paire de (deux) coudes de 15 ou 30 peut être utilisée pour offrir base du pare-feu soit de niveau avec le haut de la structure de la solive et une déviation afin d'éviter de couper les solives et de dégager d'autres fixez-le en place avec des clous vrillé...
  • Page 30: Installation Du Suppor T Mural (Aws)

    Déterminez la ligne centrale d'une connexion horizontale (section de SUPPORT MURAL - (AWS) - 2-1/2 po cheminée horizontale traversant le mur). Encadrez une ouverture aux Tel que mentionné précédemment, l'endroit idéal pour votre système dimensions spécifiées au tableau 1. Pour un mur non-combustible de cheminée est dans l'enveloppe du bâtiment.
  • Page 31 SUPPORT MURAL (WS) - Réglable jusqu'à 6po À NOTEZ: ASSUREZ-VOUS QUE VOUS AVEZ MIS DE CÔTÉ LE BOUCHON POUR TÉ, SI NON, FAITE LE MAINTENANT CAR d'un mur vertical (commandé séparément) VOUS EN AUREZ BESOIN PLUS TARD. Tel que mentionné précédemment, l'endroit idéal pour votre système À...
  • Page 32 Les étapes suivantes vous aideront avec l’installation de la bague Garniture de Ajustement de murale et le support mural. Le schéma 11 illustre une installation finition noire 4-1/2” à 8-3/4” typique d’un support mural traversant un mur combustible. Tableau 2 - Hauteur de Distance du cheminée au-dessus du support Partie externe...
  • Page 33 MÉTHODE B Fente pour l'équerre de Plaque de soutien Positionez le support mural de façon à ce que le té soit centré à support Tige du crochet l'intérieur de la bague murale. Assurez-vous que le support mural est à plomb et de niveau et fixez au mur en vous servant de tous les trous Boulon pré-perforés de chaque crochets de support.
  • Page 34: Bride Murale

    14. Employez un calfeutrant à la silicone à hautes températures Les longueurs sont simplement positionnées au-dessus du té (500°F) non durcissant pour sceller autour de la longueur de et bloquée en place en les tournant dans le sens horaire jusqu’à ce que cheminée horizontal là...
  • Page 35: Coupe-Feu Radiant

    Le support de plafond cathédral supportera un total de 18 pi. (5.5 m) SUPPORT DE TOIT (RS) de sections de cheminée. Les joints des sections de cheminée sous Le support de toit peut être employé sur un plancher, un le support cathédral doivent être fixés avec des colliers de fixation. plafond ou un toit et peut s'ajuster à...
  • Page 36: Installation Du Solin De Toit

    le grenier (AIS) et que la cheminée a été enfermée avec un enclos jusqu'à ce qu'il fasse contact avec le calfeutrant à la silicone et le cônedu autour de la cheminée. solin. Serrez l'écrou et le boulon et appliquez du calfeutrage additionnel au-dessus du collet de solin comme requis.
  • Page 37 L'HAUBAN DE TOIT (JURGK-1) Si la cheminée s'élève de 5 pi. (1.5 m) ou plus au-dessus du toit, un Boulon soutient avec haubans de toit est requis. L'hauban de toit fournira un Courroies L'ensemble support latéral à la cheminée au-dessus de la ligne de toit. contient des jambes télescopiques, une bride de blocage, 2 crochets pour le toit et la quincaillerie.
  • Page 38: Ensemble Pour Cheminée De Maçonnerie

    H. Attachez l’autre bout des jambes télescopiques aux crochets en utilisant J. Assurez-vous que la cheminée est de niveau et d’aplomb. Vérifiez toutes un (1) 1/4-20 X 1po boulon et écrou (schéma 34). dimensions et angles exigés, ajustez si nécessaire. Pour sécurité...
  • Page 39: Entretien Et Nettoyage De La Cheminée

    (gaine en acier inoxydable se situer entre 18 et 22 %. Pour vous aider à utiliser votre poêle à bois de Selkirk) qui est énuméré pour le recouvrement d'une cheminée plus efficacement, procurez-vous d’un thermomètre. Un thermomètre existante de maçonnerie.
  • Page 40 PLAQUE D'ANCRAGE (AP) - FOYER DE MAÇONNERIE AVERTISSEMENT: NE PAS UTILISER DE MATÉRIAUX COMBUSTIBLES La plaque d'encrage (AP) permet d'installer les modèles de cheminées CORROSIFS POUR L'ENVELOPPE DE LA CHEMINÉE TELS isolés JM/ALT sur un foyer de maçonnerie. Référez-vous aux sec- QUE LE BOIS FLOTTÉ, LES PLASTIQUES, LE BOIS tions suivante pour compléter l'installation de cheminée avec un foyer CHIMIQUEMENT TRAITÉ, ETC.
  • Page 41: Liste Des Pièces De Rechange

    * Le diamètre de la cheminée (6, 7 ou 8 pouces). Les modèles de cheminée SuperPro 2100 (ALT), SuperVent 2100 (SC-1) et leurs pièces sont listés au CAN/ULC-S629 et tout deux fabriqués par Selkirk, et en tant que tels sont interchangeables avec l'un et l'autre.
  • Page 42 CHARTE 1 - DÉCALAGE POUR CHEMINÉE Le besoin d'utiliser un ensemble de coude devient nécessaire pour dévier la cheminée afin de dégager un obstacle ou un colombag e . Les deux (2) tableaux ci-dessous vous aideront à sélectionner la combinaison de coude et de longueurs nécessaires pour obtenir un degré de déviation approprié...
  • Page 43 CHARTE 3 - Dégagement au tuyau de poêle en-dessous du support cathédral 1. Identifiez le type du tuyau de raccordement que vous allez utiliser: paroi simple (1) ou le modèle DSP tuyau de poêle à dou ble paroi de Selkirk (2).
  • Page 44 INFORMATION D'INSTALLATION Laissez avec le propriétaire. Propriétaire: Gardez dans un endroit sécuritaire pour référence future. INFORMATION DU PRODUIT MODÈLE DE CHEMINÉE : SuperVent 2100 / SuperPro 2100 GROSSEUR DE LA CHEMINÉE________ HAUTEUR DU SYSTÈME_________ INSTALLATION INSTALLATION INTÉRIEUR EXTÉRIEUR CONNEXION (type d'appareil): POÊLE À...

This manual is also suitable for:

Superpro 2100Sc-1Alt

Table of Contents