Site Preparation; Unpacking & Installation Instructions - Demtech Pro-Tester SE Operator's Manual

Table of Contents

Advertisement

Rev. B, October 2020

4 Site Preparation

Before proceeding with the unpacking and installation instructions in the following
section(s) make sure the work site is prepared and ready to use the Pro-Tester
have an adequate power source capable of providing clean Alternating Current (AC)
power at 110 or 220 Volts at the rated current. Refer to the system serial plate affixed to
the rear of the system for the voltage and current requirements of your system. The install
area should be clean, dry and free of debris and provide adequate working area to allow
efficient and effective use of the system.
Carefully follow the detailed unpacking and installation instructions provided in this
manual.
5 Unpacking & Installation Instructions
This section contains instructions for the unpacking, placement and installation of the Pro-
Tester
TM
. Carefully review the following information, sub-sections and each procedure
before beginning unpacking and installation of the system.
The Pro-Tester
system can be operated from within the container our removed and placed onto a work bench
or appropriate platform for use. When not in use the Pro-Tester
the shipping/transport container to protect it from the elements and potential damage.
Note: The system illustrated in this manual shows ALL available features for the Pro-
Tester
TM
, therefore, your system may vary slightly in appearance from that depicted.
Pro-Tester SE Operator's Manual
TM
comes complete in a reusable portable shipping/transport container. The
TM
. You should
TM
should always be stored in
Page 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-0100se/a

Table of Contents