Download Print this page

IBM p5 510 Quick Start Manual page 4

Hide thumbs Also See for p5 510:

Advertisement

3
Prepare the rack for installation
If you are installing your server into a new rack, ensure that you have completed the
3.1
unpacking instructions that were provided with the rack.
If your s
server.
3.2
Place the rack in the location of the installation.
Use the wrench that was provided with your rack to level the rack by raising or
3.3
lowering the front and back leveling feet .
3.4
Install the stabilizer bracket
Tip:
If necessary, remove any trim kit pieces that were previously installed on the
rack. Removing the trim kit pieces allows you to read the EIA units on the rack.
erver
is already installed in a rack, skip to task 7
B
A
on the front of the rack.
Cable the HMC and the
A
B

Advertisement

loading

This manual is also suitable for:

9110-51a