ABB Relion 650 Series Commissioning Manual page 81

Bay control
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 511 248-UUS A
The CB condition CBREADY of a type, CO, shall be high (true) until a closing operation is
performed. It then goes low (false) for a recharging time of about 5 - 10s. After that it is high
again.
A CB condition CBREADY of a type, OCO shall be high (true) before and during tripping (Initiate
reclosing). During tripping it goes low for a recharging time, for example, 10s. It may thus be low
at the instant of reclosing. After each Open or Close operation it may need a recharging period
before it goes high again.
In the example of CB simulation arrangement, the CBREADY condition is simulated by a manual
switch, SRY.
Information and material for the verification:
Protection or control unit, IED, configured and with settings entered.
Configuration diagram for the IED
Terminal diagram for the IED, or plant circuit diagram including the IED
Technical reference manual for the IED
IED test set for secondary injection
Means to indicate, measure and record operation and times, for example an event recording
facility
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY) to simulate
CBREADY
Possibly a switch simulation the synchronizing check SESRSYN (25) condition
IED
SMBRREC (79) - CLOSECB
Trip
SMBRREC (79) - CBPOS
SMBRREC (79) - CBREADY
ANSI09000206 V1 EN-US
Figure 14: Simulating the CB operation by a bi-stable relay/breaker simulator and manual
Bay control REC650
Commissioning manual
switches
© Copyright 2011 ABB. All rights reserved
BR
SC
ST
SRY
To test
set
SMBRRECSimulatingtheCBoper
ationbyabistablerelayand =
ANSI09000206_en_1
Section 7
Testing functionality
+
-