ABB A155-M57 Operation Manual page 53

Hide thumbs Also See for A155-M57:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
3 Commissioning / 3.2 Inspection procedures
3.2.3
Checks after commissioning (engine in idle mode)
Lubricating system
Keep to the lubricating oil pressure at the inlet.
u
Keep to the lubricating oil temperature at the inlet.
u
Monitoring operation →25
Refer to chapter
u
Gas, air and oil pipes
After starting the engine, check all gas, air and oil pipes for leaks.
u
3.2.4
Checks when starting up the engine
If present:
Measure speed, oil pressure and charging pressure at various engine performances.
u
Measure the exhaust gas temperature before and after the turbine.
u
Measure the air temperature before and after the compressor.
u
Compare the measured values with the values of the acceptance report. Different operat-
u
ing conditions indicate a malfunction (see chapter
Lubricants and pastes used during assembly can liquefy or vaporise and escape as oily fluids
during the initial hours of operation. Continual escape of an oily fluid indicates an oil leak. If
there is a leak, contact an ABB Turbocharging Service Station.
© Copyright 2020 ABB. All rights reserved.
for admissible values.
Eliminating malfunctions
HZTL4032_EN
→59).
Rev.P
March 2020

Advertisement

Table of Contents
loading

Table of Contents