Fig. 49: Removing The Cartridge Group With Compressor And Turbine Casing; Fig. 50: Set Down The Cartridge Group With The Compressor And Turbine Casing - ABB A155-M57 Operation Manual

Hide thumbs Also See for A155-M57:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
9 Dismantling and fitting with removed air inlet and gas outlet / 9.4
Removing the cartridge group with compressor and turbine casing
Fig. 49: Removing the cartridge group with compressor and turbine casing
4. If present: Loosen and remove the compressor wheel cooling connection. Close the com-
pressor wheel cooling opening with a screw plug (01).
5. If present: Disconnect the plug to the speed sensor (86505) and secure the rolled-up
cable on the turbocharger. This protects the plug from being crushed.
6. Attach lifting gear to the cartridge group and secure to a crane.
7. Loosen clamping nut (see
Fig. 50: Set down the cartridge group with the compressor and turbine casing
8. Lift the cartridge group with the compressor and turbine casing.
9. Fit two swivel lifting eyes (S) and secure to a second set of lifting gear.
10. Turn the compressor and turbine casing and set down on suitable supports.
11. Remove lifting gear from cartridge group. Leave second lifting gear attached to com-
pressor casing for safety.
12. Remove and dispose of the O-rings (42195, 42200).
© Copyright 2020 ABB. All rights reserved.
Loosening the clamping nut
HZTL4032_EN
→12).
Rev.P
March 2020

Advertisement

Table of Contents
loading

Table of Contents