Summary of Contents for Dancover PRO EventZone 6m Series

  • Page 1 Party PRO EventZone 6m Series 22-08-2014...
  • Page 2 Note: Marquees are intended for events and other arrangements and are as such only meant for short term temporary assembly and the following disassembly. Dancover warranty applies only to the normal use of the Product, normal wear and tear excepted, in accordance with written use instructions or manual.
  • Page 3 ____________________________________________________________________________________ Contents 1. General 2. Frames Assembling Guide 3. ‘Cover and Sidewalls’ Assembling Guide Part list Fundamental Page 2 of 12...
  • Page 4 ____________________________________________________________________________________ 1. General Before assembling, workers should acquaint themselves with the safety precautions, necessary implements and materials. Safety Precautions: A. The supervisor needs at least 6 assistants to set up the tent. B. Before starting to work, the supervisor has to make his assistants familiar with the sequence of operations and safety precautions.
  • Page 5 ____________________________________________________________________________________ M. During or after the setup, if there is bad weather, especially when hailstone is reported by weather forecast, please dismantle the tent. If the snow depth is equal to or thicker than 3cm, please clean the snow on the roof. If the wind speed is equal to or faster than 80 Km/h, the tent has to be closed completely (all Roof-Cover, Gable-Cover, Sidewall &...
  • Page 6 ____________________________________________________________________________________ bolt connect Foot-Plates, Upright-Supports, Roof-Beams, Eave-Connections and Top Connections. And then, erect the first frame of the tent. Erect the first section: A. Erect the second frame B. Fix the X-Cross bars by bolts C. Put the Eave-Purlin, Intermediate-Purlin and Roof-Purlin on the Roof-Beams Page 5 of 12...
  • Page 7 ____________________________________________________________________________________ Erect all frames and put the purlins on the roof as the first section. Place the portal beams like shown below opposite each other and on different sections. Portal beam Portal beam Page 6 of 12...
  • Page 8 Page 7 of 12...
  • Page 9 Page 8 of 12...
  • Page 10 Page 9 of 12...
  • Page 11 6x12 6x15 Part Part Description Drawing Roof beam Beam Purlin Gable pole Normal top tube Gable top tube Bottom tube Portal beam Steel fork Apex Knuckle Foot plate Cover Page 10 of 12 22-08-2014...
  • Page 12 6x12 6x15 Part Part Description Drawing Sidewall w. window Roll up door wall Plain wall Gable Wall Bolt 10x60mm Bolt 10x80mm Bolt 10x110mm 22-08-2014 Page 11 of 12...
  • Page 13 ____________________________________________________________________________________ Fundamental A. Make sure the surface of the aluminum profiles are glabrous and avoid a damage of the protective layer B. The stack height of the aluminum profiles can’t exceed 80cm. Otherwise, you should put a crosstie every 80cm height C.
  • Page 14 Contact information Head office: Dancover A/S For more information Nordre Strandvej 119 G please visit: 3150 Hellebæk www.dancovershop.com Denmark National contact Denmark: 70 26 76 20 Spain: 911 436 828 denmark@dancover.com espana@dancover.com UK: 020 8099 7570 Italy: 02 479 21 198 uk@dancover.com...