IBM Power System 9008-22L Manual page 72

Pcie adapters
Hide thumbs Also See for Power System 9008-22L:
Table of Contents

Advertisement

Figure 39. Installing the service access cover
4. Unlock the blue rail safety latches (A) by pushing them inward.
Ensure that the cable management arms can move freely. Ensure that the cables at the rear of the
unit do not catch or bind as you push the unit into the operating position.
58 Power Systems: PCIe adapters for the 9008-22L, 9009-22A, or 9223-22H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 9009-22aPower system 9223-22h

Table of Contents