HAKKEN SPO-14Ai-U Instruction Manual

Diamond core drill

Advertisement

Quick Links

DIAMOND CORE DRILL
SPO-14Ai-U
INSTRUCTION MANUAL
◎ Thank you for purchasing our products.
◎ Before using, please read Instruction manual carefully, and use the machine
safely by following the instructions.
◎ After reading, please keep it where anyone can utilize.

Advertisement

Table of Contents
loading

Summary of Contents for HAKKEN SPO-14Ai-U

  • Page 1 DIAMOND CORE DRILL SPO-14Ai-U INSTRUCTION MANUAL ◎ Thank you for purchasing our products. ◎ Before using, please read Instruction manual carefully, and use the machine safely by following the instructions. ◎ After reading, please keep it where anyone can utilize.
  • Page 2 MEANING OF SIGNAL WARDS WARNING & CAUTION The instruction manual includes two signal words ;  WARNING &  CAUTION which are meant as follows.  WARNING It is assumed that if the user uses the machine wrongly, it would be the risks that the user could be died or injured.
  • Page 3: Table Of Contents

    CONTENTS 1.WARNING AND CAUTION 【1】 Safety Notice for Electric Tools ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 【2】 Notes for Usage of Core Drill ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 【3】 For Mounting Drill Carriage Assy. and Pole Base ・・・・・・・・・・・・・・・・・・・・ 2.DESCRIPTION ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 3.SPECIFICATIONS ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 4.STANDARD ACCESSORIES ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 5.APPLICATIONS ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 6.GENERAL DRAWING AND SPECIFICATIONS IN OPERATION ・・・・・・・・・・・・・...
  • Page 4: Warning And Caution

    1. WARNING AND CAUTION ◎ To avoid the risk of fire, electric shock and personally injury, follow all the instruction mentioned in "Safety Notice for Electric Tools" and "Notes for Usage of Core Drill". ◎ Before using, please read "WARNING & CAUTION", and follow the instructions for your safety. ◎...
  • Page 5  WARNING 10. Use accessories and options that we recommended. ◎ It might cause the accidents or personal injury if you use the accessories and the options which are not listed in the manual or CONSEC's catalogue. Please do not use the accessories and the options which CONSEC does not recommend.
  • Page 6: 2】Notes For Usage Of Core Drill

    【2】Notes for Usage of Core Drill (In case of combination with CONSEC's original Drill Carriage Assy. and Pole Base.)  WARNING 1. Check for the embedded conduit etc. ◎ In case that you contact to the electric wire or conduit in that there are electric current, you may receive the electric shocks.
  • Page 7: 3】 For Mounting Drill Carriage Assy. And Pole Base

    Use Drill Motor in one of the following ways. ◎ To combine with a genuine “HAKKEN” brand Drill Carriage Assy. and Pole Base. ◎ To combine with the CE marked Drill Carriage Assy. and Pole Base.
  • Page 8: Description

    2. DESCRIPTION Attaching Screw Hole M8 P1.25 Depth 23mm Switch (Built-in Circuit Breaker) Motor Name Plate Carbon Cap CEE17 Plug(Cord0.2m) Speed Change Knob Water Cock Hose Band 00 (Standard Accessories) Hose 12×250 (Standard Accessories) Unified screw (1-1/4”-7 UNC) -6-...
  • Page 9: Specifications

    3. SPECIFICATIONS Model SPO-14Ai-U Motor Single phase series commutator motor Power Supply Single-phase A.C. 230V 50Hz Rated Current 10.4A Max. Output 3400W No Load Speed 300/700min Max. Bit Dia. 14” Core Bit Installing Screw Unified screw (1-1/4”-7UNC) Geared Motor Weight (Excluding cord) 13.3kg...
  • Page 10: General Drawing And Specifications In Operation

    6. GENERAL DRAWING AND SPECIFICATIONS IN OPERATION ◎ Core drill installed on to □59 Pole Base. Drill Head □59 Drill Carriage Assy. Drill Motor Feeding Handle □59 Pole Base Bolt Square Washer Core Bit Hex. Nut Leveling Bolt Water Collector Water Collector Fitting -8-...
  • Page 11: Operational Instructions

    Applicable Core Bit Dia. Model Speed change Position inch 700min 28 ~ 160 1 ~ 6 SPO-14Ai-U 300min 180 ~ 305 7 ~ 12 3.Installation of core bit ◎ Thread core bit onto main shaft. 4.Installation of Water Collector ◎ Secure Water Collector with Water Collector Fitting.
  • Page 12 6.Arrangement for water supply ◎ Connect a hose between a water source and water cock using Hose Adapter.  WARNING Do not stop water supply during operation. 7.Core drilling  WARNING When drilling a through-hole, take proper measures to provide for protection on the other side where core bit penetrates.
  • Page 13: 1】 Maintenance

    8. MAINTENANCE AND INSPECTION 【1】 Maintenance 1) Clean the surface of the machine after using. Regarding the outer frame of the Drill Head, the part of the gear case is made of aluminum, and the part of the motor is made of the sturdy synthetic resin. If gasoline, thinner, petroleum or kerosene are adhered to the outer frame of the Drill Head, the surface of the Drill Head will be damaged.
  • Page 14 Using Torque Wrench, fasten the clutch. Tightening Tightening Model Hex. Bar Wrench Torque Direction Clutch Adjusting Pin SPO-14Ai-U 65N・m Left Torque Wrench  CAUTION Right Tightening more than specified value might cause the damage to clutch adjusting pin and Drill Motor.
  • Page 15 5) After completion of 1) - 4), pull out Clutch Adjusting Pin. Hang Single-ended Wrench 36mm on the Main Shaft and then stick the main shaft by a handle of the wrench touching the pole. Make sure that the main shaft is locked. Turn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking.
  • Page 16: For Repairing

    11. WARRANTY We will guarantee the HAKKEN Core Drill SPO-14Ai-U for 6 months from the date of delivery. During this period we will rectify material and production defects free of charge. We are not responsible for any other damage direct nor indirect other than this. This warranty...
  • Page 17: Ce Declaration Of Conformity

    We declare under our sole responsibility that our below-mentioned products are in conformity with all the relevant provisions. Product Name : Diamond Core Drill Model : SPO-14Ai-U Council Directive : 72/23/EEC , 89/336/EEC , 92/31/EEC , 98/37/EC Relative Standard : EN292-1 , EN292-2 , EN55014 , IEC1029-1 , IEC1029-2-6...
  • Page 18 Main office : 4-6-8 Shoko Center Nishi-ku Hiroshima 733-0833 Japan International Department : 1-7-5-1, Sakaimachi, Naka-ku, Hiroshima, 730-0853 Japan Phone : 81-82-297-3231 Fax : 81-82-297-3230 E0281-1 -16-...

Table of Contents