Greasing the Bearings and
Bushings
The machine has grease fittings that must be lubricated
regularly with No. 2 General Purpose Lithium Base Grease.
If the machine is operated under normal conditions,
lubricate all bearings and bushings after every 50 hours of
operation or immediately after every washing.
The grease fitting locations and quantities are:
Traction Unit
Brake shaft pivot bearings (5) (Fig. 16)
Rear axle pivot bushings (2) (Fig. 17)
Steering cylinder ball joints (2) (Fig. 18)
Tie rod ball joints (2) (Fig. 18)
King pin bushings (2) (Fig. 18). The top fitting on the
king pin should only be lubricated annually
(2 pumps).
Lift arm bushings (1 per deck) (Fig. 19)
Lift cylinder bushings (2 per deck) (Fig. 19)
Cutting unit spindle shaft bearings (1 per cutting unit)
(Fig. 20)
Cutting unit carrier arm bushings (1 per cutting unit)
(Fig. 20)
Figure 16
1. Top fitting on king pin
31
Figure 17
1
Figure 18