LG GR-L208NN Service Manual page 96

Table of Contents

Advertisement

TROUBLE DIAGNOSIS
Items
4.Vacuum degassing.
5.Refrigerant charging.
Compressor
3
Pipe Connection
Connect a red hose to the high pressure side and a blue hose to the
low pressure side.
Vacuum Sequence
Open
,
valves and evacuate for 40 minutes. Close valve
Charging sequence
1) Check the amount of refrigerant supplied to each model after completing vacuum
degassing.
2) Evacuate bombe with a vacuum pump.
3) Measure the amount of refrigerant charged.
- Measure the weight of an evacuated bombe with an electronic scale.
- Charge refrigerant into a bombe and measure the weight. Calculate the weight of
refrigerant charged into the bombe by subtracting the weight of an evacuated bombe.
Indicate the weight of
an evacuated bombe
R134a
Precautions
Evaporator
Suction pipe
Drier
Condenser
Blue
Vaccum
Pump
Calculation of amount of refrigerant charged
the amount of refrigerant charged= a weight after charging -
a weight before charging (a weight of an evacuated cylinder)
- 96 -
2
1
Low
pressure
High
pressure
Yellow
Red
KEYPOINTING
- If power is applied
during vacuum
degassing, vacuum
degassing shall be
more effective.
- Operate compressor
while charging
refrigerant. (It is
easier and more
certain to do like
.
this.)
KEYPOINTING
- Be sure to charge
the refrigerant at
around 25°C.
- Be sure to keep -5g
in the winer and
+5g in summer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gr-l248nn

Table of Contents