INSTALLATION REQUIREMENTS
INSTALLATION REQUIREMENTS
Tools Required
·
Phillips Screwdriver
·
Pencil
·
Caulk Gun
·
Measuring Tape
·
Safety Glasses
·
Center Punch
·
Hammer
·
Knife
·
Masonry Drill & 6mm Drilll Bit
·
Level
Materials Required
·
Drop Cloth
·
Tape
·
Silicone Sealant
INSTALLATION
Mark the wall 20mm in from the front edge of the tray.
20mm
1279909-T01-A
·
·
·
·
·
·
·
·
·
6mm
·
·
·
·
Mark the wall 20mm in from the
front edge of the tray on both
sides.
IMPORTANT
Tray must be level in all planes
or door will not install properly.
0mm
IMPORTANT:
Tray
MUST
be level
along front edge.
-4-
20mm
STEP
1