2 INSTALLATION RECORD:

The heating system must be inspected in accordance with applicable regulations before commissioning. The inspection must
be performed by a qualified person. The installation record should be completed before the equipment is handed over to the
end-user. A completed installation record is a precondition for the validity of the warranty.
Inspected
Description
COLLECTOR CIRCUIT:
Circulation direction checked
System pressure-tested
System rinsed
System bled
Fluid quantity in the collector
Operating pressure of the collector _______bar
Strainer checked/cleaned
Expansion tank
Initial pressure of the expansion tank (0.5 bar)
Strainer/flow direction
Safety valve checked
Shut-off valves checked
Length of the collector
- If there are several loops, record the lengths:
HEATING SYSTEM:
System filled
Operating pressure of the heating system
______bar
Accumulator coil filled / bled (coil
accumulator)
System pressure-tested
System rinsed
System bled
Safety valve
Diaphragm expansion tank
Initial pressure of the expansion tank
Strainer checked/cleaned
Pressure measuring device
Shut-off valves
Filling valve
Buffer tank
Heating circuit control set
Circulator pumps
Rotation direction of pumps
Actuators
DOMESTIC HOT WATER:
System filled
System pressure-tested
System rinsed
Safety valve
Pressure measuring device
Buffer tank
Hot water circulation
6
Comment
m
Checked by
Checked by
Checked by
Gebwell T3 Inverter | Gemini Inverter installation manual
m
(date)
(date)
(date)