Page 1
Operation Manual FOAMICO ULTRA NEXT Main station MS 0106-2-XA(7001412) MS 0106-1 (7001414), MS 0106-2 (7001415) MSC 0106-1 (7001416), MSC 0106-1 (7001417) MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Table of contents 1. Introduction Condition of liability Guarantee conditions. Protection against frost Safekeeping Declaration of conformity 2 Safety Safety during operation of the system Precautionary measures Appropriate utilization 3 Models and symbols Symbols Models. Model Overview 4 Installation Safety instructions for Mounting and Installation Location and Mounting Water supply 4.3.1Venting:...
Page 3
8.1.2Electrical diagram 24 DC Electrical diagram MSC 0106 8.2.1Electrical diagram 240V AC 8.2.2Electrical diagram 24 V DC Spare part control system. 9 Flow diagrams MS 0106-2-EX, MS 0106-1-2, MSC 0106-1-2. 10 Trolley (7002085) for MS 0106-2-EX, MS 0106-1-2, MSC 0106-1-2. 11 Name plate 12 Declaration of Conformity MSC 0106_NEXT_7001412-17_UK...
This guarantee becomes void if changes or repairs have been implemented by non-authorized persons. Any claims under the guarantee will only be accepted if they are announced to FOAMICO immediately after the damage has been observed. This guarantee becomes void as soon as the system changes ownership.
Should the manual get lost, please don’t hesitate to require another one from your agent Declaration of conformity We FOAMICO declare that this product is in conformity with the following directives: - Machinery (2006/42/EC) Safety Safety during operation of the system Suitable working clothes are recommended, e.g.
Rinsing with water, spreading foam and disinfection within the stated boundaries. Any other kind of application or use beyond this is considered to be inappropriate and deviant concerning the requirements, and may lead to dangerous situations. FOAMICO is not liable for any sequential damages brought about by this.
ATTENTION. At the supply pipe to the main station a valve and filter must be installed. We recommend using Original FOAMICO installations set. The water should be connected to the inlet shown in POS A. fig. ATTENTION! The pump must be filled with water and vented. This must be done with the electricity cut off.
AFTER mounting the system flushing of the pipes must always be done with the system in “rinsing mode”, in order to avoid any impurities in the injector system. Please keep rinsing until the rinsing nozzle shows an invariable clean water jet coming out. Electrical Supply WARNING The user or the installer is responsible for the installation of correct Grounding and protection according to...
Operation Start and stop procedure ATTENTION! Do not start the main station until the pipe system has been filled with water and vented. Do not start the main station until the pump has been filled with water and vented. If the system runs dry or partly filled the pump and other components may be damaged.
Spray disinfection 1. Mount the disinfection nozzle in the coupling at the low pressure valve / gun (marked with yellow protection) 2. set the handle POS. D fig. 5.1 in disinfection position 3. The system is now ready for sanitizing. Sanitize by open the low pressure valve / gun. 4.
Page 12
MS ULTRA NEXT 0106-2 XA MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Page 13
MS ULTRA NEXT 0106 MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Page 14
MSC ULTRA NEXT 0106 A. Connection for water supply D. Handle for selecting operation E. Connection for hose. Rinse and foam G. connection for limiting nozzles. Adjust concentrations H. Pressure reducer for air. Table 5.1 MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Troubleshooting / Failures Troubleshooting. Fault Cause Action No rinsing pressure. Booster or main station not started. Start booster/or main station. Too many users on the same time. Check maximum number of users. The ball valve at the inlet of the system is Open the ball valve.
Check the nozzles on a regular basis. 1 to 2 times every month is recommended. Change the nozzle if they are damaged. To be sure you will get the optimized result we recommend using FOAMICO nozzles. Low pressure valves / guns They must be checked regular.
ATTENTION! Non- return valves should be checked once every week. It is recommended to change every 1-2 year. Use only Original FOAMICO non-return valves. Suction filter / chemical hose. The suction filter for chemical should be clean once every week. It is recommended to change filter and chemical inlet hose every year.
7.1.1 Main station MS 0106 – Ultra NEXT - series Figure 9.1.1 Overview *only MS 0106 -XA and ** only MS 0106 and *** only MSC 0106. MSC 0106_NEXT_7001412-17_UK 22-08-2019...
7.1.3 Pipe system foam and rinse circuit part number. 1002305 for XA. 1002306 for MS. 10002307 for MSC Figure 9.2. Spare parts listt pipe system foam and rinse circuit MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Page 24
QTY. Description Description1 Beschreibung 1001666 Ball / shaft for 2 injector system Kugle - Welle für 1002173 Block center part 2 Injector system Block-Mittelteil 1001677 Union part for 2 Injector system Verschraubung 1000533 Bearing for shaft 3 injector system Lager für Welle 1001684 Ball for check valve Ø14mm Ceramic...
Flow diagrams MS 0106-2-EX, MS 0106-1-2, MSC 0106-1-2. MS 0106-2–EX MS 0106-1-2 MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Page 33
MSC 0106-1- -MSC 0106-2. Inlet Outlet A. Water inlet B. Water outlet for satellite connection C1-C3. Chemical inlet D. Air inlet E. Outlet for rinse and foam Components 1. Flow switch 3. Pump 8. Check valve water 9. Rinse / foam block 10.
Trolley (7002085) for MS 0106-2-EX, MS 0106-1-2, MSC 0106-1-2. Figure 12.1. Spare parts list Trolley. QTY. Description Description1 Beschreibung 1001630 Frame Light Trolley Ramme 1000340 Rear wheel Ø250-60-Ø25 Rad Groß 1001629 Can bracket for Light Trolley Halter für Kanister 1000341 Front wheel Ø...
Name plate 1. Company Name 8. Maximum pressure 2. Production date 9. Min/Max inlet pressure. 3. Serial number 10 Power 4. Item Number 11. Current 5. Model type 12. Voltage 6. Maximum allowed flow 13 Frequency 7. Maximum temperature in Celsius MSC 0106_NEXT_7001412-17_UK 22-08-2019...
Declaration of Conformity Declaration of Conformity We FOAMICO declare under our sole responsibility that the MO NEXT 0127-0 - 5, MO NEXT 0227-0 - 5, MO NEXT 0145-1 – 5. MS NEXT 0112-1 – 5, MS NEXT 0127-1 – 5, MS NEXT 0227-1 – 5 MS NEXT 0327-1 - 5, MS NEXT 0427-1 –...