Table 4—Gas Pipe Sizes
NATURAL GAS
Pipe Capacity—Btuh Input
Length
of Pipe
(Ft)
1/2 in.
20
92,000
40
63,000
60
50,000
Length
Pipe Capacity—Btuh Input
of Pipe
Copper Tubing*
(Ft)
5/8 in.
20
131,000
40
90,000
60
72,000
* Outside diameter.
NOTE: The length of pipe or tubing shown should be measured from gas meter or
propane second-stage regulator.
The boiler and its individual shutoff valve must be disconnected from gas supply piping system during any pressure testing of gas supply piping
system at test pressures in excess of 0.5 psig (3.5 kPa).
The boiler must be isolated from gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas
supply piping system at test pressures equal to or less than 0.5 psig (3.5 kPa).
PROCEDURE 2—CONNECTING GAS PIPING
Refer to Fig. 11 for general layout at boiler. It shows the basic fittings needed. The gas line enters boiler from right side.
The following rules apply:
1. Use only those piping materials and joining methods listed as acceptable by the authority having jurisdiction or in the absence of such
requirements, by the NFGC.
2. Use pipe joint compound suitable for LP gas on male threads only.
3. Use ground joint unions.
4. Install a sediment trap upstream of gas controls.
5. Use 2 pipe wrenches when making connection to gas valve to keep it from turning.
6. Install a manual shutoff valve in vertical pipe about 5 ft above floor.
7. Tighten all joints securely.
8. Propane gas connections should only be made be a licensed propane installer.
9. Two-stage regulation should be used by propane installer.
10. Propane gas piping should be checked by propane installer.
PROCEDURE 3—CHECKING GAS PIPING
Upon completion of piping, check immediately for gas leaks. Open manual shutoff valve. Test for leaks by applying soap suds (or a liquid
detergent) to each joint. Bubbles forming indicate a leak. CORRECT EVEN THE SMALLEST LEAK AT ONCE.
WARNING: Never use a match or open flame to test for leaks. Use a soap-and-water solution. A failure to follow this
warning could result in fire, explosion, personal injury, or death.
See Fig. 12-15 for wiring diagrams of the various models.
PROCEDURE 1—ELECTRIC POWER SUPPLY
WARNING: Turn off electric power at fuse box before making any line voltage connections. Follow local electric
codes. Failure to follow this warning could result in electrical shock, personal injury, or death.
All electrical work must conform to local codes as well as the National Electrical Code (NEC) ANSI/NFPA-70-2002.
Run a separate 120-v circuit from a separate overcurrent protective device in electrical service entrance panel. This should be a 15-amp circuit.
Locate a shutoff switch at boiler. It must be turned off during any maintenance. Connect 120-v electrical supply to primary leads on 24-v
transformer. Solder and tape or securely fasten these connections with wire nuts.
Includes Fittings
3/4 in.
1 in.
1-1/4 in.
190,000
350,000
625,000
130,000
245,000
445,000
105,000
195,000
365,000
LP GAS
Includes Fittings
Iron Pipe
3/4 in.
1/2 in.
3/4 in.
216,000
189,000
393,000
145,000
129,000
267,000
121,000
103,000
217,000

ELECTRICAL WIRING

AUTOMATIC
GAS VALVE
MANIFOLD
FLOOR LINE
Fig. 11—Gas Piping at Boiler
—13—
MANUAL
SHUTOFF
VALVE
GROUND JOINT
UNION
SEDIMENT TRAP
A95148