Mitsubishi Electric E1060 Installation Manual page 10

Hide thumbs Also See for E1060:
Table of Contents

Advertisement

Installation
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
B
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
C
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
D
Caution
- The operator panel must be brought to ambient temperature
- Ensure that the voltage and polarity of the power source is correct.
RS422/
RS485
RS232
C
Ethernet
5. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
10
x 6
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
B
Controller
24V DC
D
A
0.5 - 1.0 Nm
2
.
Power
24V DC
Mitsubishi Electric, MA00817C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E1062

Table of Contents