Airxcel Eubank 7AA1024A Installation & Operation Manual

Airxcel Eubank 7AA1024A Installation & Operation Manual

Vertical wall-mount air conditioners with front control box panel
Table of Contents

Advertisement

Quick Links

Installation & Operation Manual
11 EER Vertical Wall-Mount Air Conditioners
7AA1024A-7AA1060A (Single Stage)
7AA2036A7AA2060A (2-Stage)
This manual may include information for options and features which may not be
included on the unit being installed. Refer to the unit data label or Model Identification
to determine which features and options this unit is equipped with.
INSTALLER: Affix the instructions on the inside of the building adjacent to the thermostat.
END USER: Retain this manual for future reference.
A Division of the AIRXCEL
P.O. Box 400 • Cordele, Georgia 31010 • 156 Seedling Drive • Cordele, Georgia 31015
E-mail: eubanksales@airxcel.com • Internet: www.EubankWallmount.com
The most current version of this manual can be found at www.EubankWallmount.com.
MODELS:
IMPORTANT
Manufactured By:
(229) 273-3636 • Fax (229) 273-5154
Air Conditioner Product Manual
Vertical Wall-Mount Air Conditioners
with Front Control Box Panel
Commercial Group
®
Eubank 7AA1024A-1060A & 8AA2036A-2060A I&O Manual 07/2021 Rev.3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Eubank 7AA1024A and is the answer not in the manual?

Questions and answers

Summary of Contents for Airxcel Eubank 7AA1024A

  • Page 1 P.O. Box 400 • Cordele, Georgia 31010 • 156 Seedling Drive • Cordele, Georgia 31015 (229) 273-3636 • Fax (229) 273-5154 E-mail: eubanksales@airxcel.com • Internet: www.EubankWallmount.com The most current version of this manual can be found at www.EubankWallmount.com. Eubank 7AA1024A-1060A & 8AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 2 Used to point out helpful suggestions that will result in improved installation, reliability or IMPORTANT operation. AS PART OF THE EUBANK CONTINUOUS IMPROVEMENT PROGRAM, SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE. © 07/2021 Marvair, Division of Airxcel, Inc. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 3: Table Of Contents

    Porting and Duct Work ..........................35 Fresh Air Hood Installation ........................36 Bracket Installation ..........................37 Mounting the Unit ..........................37 Electrical Connections ...........................38 Chapter 4 Start-Up Check-Out of Cooling Cycle .........................42 Check-Out of Heating Cycle ........................42 Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 4 Compressor Troubleshooting .........................45 Control Board Diagnosis ........................45 Chapter 6 Maintenance Scheduled Maintenance .........................46 Chapter 7 Warranty Airxcel Commercial Group Limited Product Warranty .................47 Chapter 8 Start-Up Checklist Start-Up & Commissioning Form ......................48 Appendix A Installation Instructions for Field Installed Electric Heaters ................52 Illustrations Figure 1a.
  • Page 5: General Description

    18 x 24 x 2 457 x 610 x 52 81257 Table 1. Return Air Filter Sizes MODEL 7AA1024A 7AA1030A 7AA1036A 7AA1042A 7AA1048A 7AA1060A 7AA2036A 7AA2042A 7AA2048A 7AA2060A Ounces Table 2. Refrigerant Charge (Ounces) Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 6: Table 3 Cfm @ External Static Pressure

    Table 3. CFM @ External Static Pressure (Wet Coil) (IWG) MODEL Non-Economizer 7AA1024A 7AA1030A/1036A & 7AA2036A/2042A 7AA1048A/1060A & 7AA2048A/2060A With Economizer 7AA1024A 7AA1030A/1036A & 7AA2036A/2042A 7AA1048A/1060A & 7AA2048A/2060A Table 4. Shipping Weights for Eubank Wall Mount AC Units Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 7: Model Identification

    3 = CCH w/Hot Gas Bypass Model Nomenclature + = None $ = Special Note: Not all options are available with all configurations. Contact your Eubank sales representative for configuration details and feature compatibility. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 8: General Operation

    The Extreme Duty Kit is always factory installed. Non-economizer air conditioners will operate from 0° F to 131° F (-18° to 55°C). Economizer equipped air conditioners will operate from -40° F to 131° F (-40° to 55°C). Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 9 If the temperature in the controlled environment rises above the set point of the thermostat and the unit is operating in the dehumidification Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 10 Controls and components which allow the units to operate in very hot ambients (131°F/55°C). Includes a thermal expansion valve, a sealed condenser fan motor and a sealed control box. A closed loop design on non-economizer units insures that no outside air is introduced into the shelter. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 11: Electrical Operation

    The condenser (outside fan) motor is energized by the same contactor. However, the motor is cycled on and off by the low ambient control (see low ambient control 1.6). The indoor evaporator fan motor is controlled by the fan purge on the electronic control board. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 12: Figure 1A. Typical Electrical Schematic - Non-Economizer

    TEST IBMSEL OFMSEL 0-10V 0-10V IBMSEL OFMSEL Figure 1a. Typical Electrical Schematic - Non-Economizer) Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 13: Figure 1B. Typical Electrical Schematic - W/Economizer

    TEST IBMSEL OFMSEL 0-10V 0-10V IBMSEL OFMSEL Figure 1b. Typical Electrical Schematic - w/Economizer Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 14: Figure 1C. Typical Electrical Schematic - W/Economizer (Alternate Construction)

    Figure 1c. Typical Electrical Schematic - w/Economizer (Alternate Construction) Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 15: Figure 1D. Typical Electrical Schematic - W/Economizer (Alternate Construction)

    Figure 1d. Typical Electrical Schematic - w/Economizer (Alternate Construction) Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 16: Figure 1E. Typical Electrical Schematic - W/Economizer (Alternate Construction)

    Figure 1e. Typical Electrical Schematic - w/Economizer (Alternate Construction) Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 17: Economizer Components

    The sensor has eight set points. The factory setting is 58°F (14.5°C). These set points can be changed by moving the DIP switches on the top of the dry bulb sensor. See Fig. 2. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 18: Figure 2. Dry Bulb Sensor

    NO outside air will be brought into the building. Setting the potentiometer to MAX means that the damper stays in the full OPEN position at all times. Factory setting is 50%. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 19: Figure 3. Enthalpy Sensor Temperature Control Points

    Jumper W3 allows us to use alternative brands at a future date. On all current air conditioners, pins 1 & 2 are jumpered on W3. See item 4 in Figure 4. Figure 3. Enthalpy Sensor Temperature Control Points Eubank Economizer Controller Figure 4. Electrical Controls, 7AA Alternate Construction Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 20: Figure 5. Economizer Control Board

    9. Enthalpy DIP Switches (MAR) terminal Set points are same as previous Honeywell controller. Factory setting is 4 (63°F/17.2°) 1=A (73°F/23.8°C) 2=B (70°F/21.1°C) 3=C (67°F/19.4°C) 4=D (63°F/17.2°) Figure 5. Economizer Control Board Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 21: Chapter 2 Electronic Control Board

    Lockout contacts are also provided along with the alarms being transferred via MODBUS. This chapter provides the necessary information for installing and operating the Eubank PCB. The diagram below identifies the inputs, outputs and connections for the Eubank PCB. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 22: Installation And Replacement

    Low pressure switch has opened twice Status 2 3 Blinks Freeze stat (optional) - Indoor coil temperature is below 35°F (1°C) Continuous Flash of Both LEDs Insufficient voltage to the board. Less than 20 Volts Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 23: Figure 6A. Setting The Speed For The Y1 And Y2 Operation For Indoor Motor

    Use the potentiometer marked “IBM SPEED” to set the required speed. Bridge Jumper Position For Setting Y2 Speed IBM SPEED Potentiometer Figure 6b. Second Stage Cooling Speed Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 24: Figure 7. Output Termination For Indoor Motor Control Signal

    Outdoor Motor PWM Signal Output. One Wire Connected to “GND” and the Other Connected to “PWM” Outdoor Motor 0-10V Signal Output. One Wire Connected to “GND” and the Other Connected to “0-10V” Figure 9. Output Termination for Outdoor Motor Control Signal Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 25: Figure 10. Communications Setup

    MODBUS Network Address DIP switches. See Addressing Table Baud Rate - 19200 BPS: Between Upper and Middle Pin Baud Rate - 9600 BPS: Between Lower and Middle Pin Figure 10. Communications SetUp Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 26: Sequence Of Operation

    5.1 High Pressure Lockout 5.2 Low Pressure Lockout 5.3 Low Voltage 5.4 Anti-short Cycle 6.0 Additional Features 6.1 MODBUS communication 6.2 Modulating Head Pressure Control 6.3 Freeze Stat Operation 6.4 Onboard Thermostat Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 27 “Y1” speed setting on the board or via MODBUS. It also outputs a request dependent (based on FCC IN) control signal for the Outdoor Fan Motor. In Stage 1 Cooling operation, the compressor Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 28 “FCC IN” input is High. The board continues to produce these outputs until the Dehumidification request is dropped. Once this request is dropped, the Indoor Fan Motor continues to run for 90 seconds. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 29 The sequence of operation is the same as described above for the various operation, but Indoor Motor speeds for various operation, Outdoor Motor Speed, Heating Setpoint and Cooling Setpoint (if applicable) has to be configured via MODBUS. See MODBUS register tables at the end of this section. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 30: Table 7A. Modbus Discrete Registers

    0 = Off, 1 = Energized 0 = Modbus only Enables or disables reading the thermostat inputs in Modbus 1 Bit 1 = Read thermostat Inputs mode Default is 0 Table 7a. MODBUS Discrete Registers Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 31: Table 7B. Modbus Registers

    12 = Future Use 13 = Freeze Fault 1 14 = Freeze Fault 2 15 = Y1 Locked Out 16 = Y2 Locked Out 17 = Low Voltage Table 7b. MODBUS Registers Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 32: Chapter 3 Installation

    National Fire ® Protection Association Standards 90A and 90B before designing and installing duct work. The duct system must be engineered to insure sufficient air flow through the unit to prevent over-heating of Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 33: Table 8 Minimum Clearances

    Electrical Rating Designations* Nominal Voltage 208/230 208/230 Phase Minimum Voltage Maximum Voltage * Letters refer to model number code designations. Refer to page 5. Table 9 Voltage Limitations Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 34: Installation Materials

    ) are needed for installation. ® For example, the list below contains approximate quantities of items typically needed for mounting a unit on a wood frame wall structure. Concrete or fiberglass structures have different requirements. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 35: Porting And Duct Work

    When installing the wall sleeve, the supply opening must be on top. The supply opening is smaller than the return air opening. Ducting Extensions should be cut flush with the inside wall for applications without duct work. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 36: Fresh Air Hood Installation

    (no fresh air). To provide fresh air, remove the two screws on either side of the hood and reposition as desired. Figure 11. Fresh Air Hood Damper, Models 1024A-1060A & 2036A-2060A Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 37: Bracket Installation

    For units with electric heat, a one inch clearance is required around the duct extensions. The duct extensions must be constructed of galvanized steel with a minimum thickness of .019” as per the NFPA standards 90A & 90B. Figure 12. Eubank A/C Wall Mount Detail Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 38: Electrical Connections

    Note: Power supply service must be within allowable range (+10% - 5%) of rated voltage stamped on the unit rating plate. To operate nominal 230/208V unit at 208V, change the transformer line tap from 240V to 208V following the instruction on wiring label in unit. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 39 Continuous fan operation: For continuous indoor fan operation on single units, install a jumper between terminals 8 and 3. For continuous indoor fan operation on dual units using the older LL357D4, install jumper between 8 and 3 and remove jumper between 1 and 3. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 40: Figure 13A. Humidistat Wiring Details

    Eubank's unique vertical packaged wall mount air conditioners or other environmental control units. See CommStat 3 Product Data Sheet for installation and programming instructions. Figure 13a. Humidistat Wiring to a Eubank Air Conditioner with Reheat. Figure 13b. Thermostat Connection Diagram Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 41: Figure 13C. Commstatâ„¢ 3 Hvac Controller Wiring Detail

    Figure 13c. CommStat 3 Wiring Diagram Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 42: Chapter 4 Start-Up

    NOTE: (Economizer Equipped models only) The damper blade should remain closed during the heating cycle (unless the minimum position potentiometer has been set for constant ventilation A fully counterclockwise position corresponds to full closure of the damper. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 43: Chapter 5 Troubleshooting

    2. Check for proper charge and possible refrigerant leak. 3. Component failure. 3. Check internal components, especially compressor for proper operation. 4. Unit undersized for job. 4. Add additional units for greater capacity. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 44 1. Check resistance element(s) for continuity. (units equipped with resistance ele- ments) 2. Thermal limit open. 2. Check continuity across thermal limit switch. 3. Defective heater contactor. 3. Check relay for proper operation. Replace if defective. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 45: Compressor Troubleshooting

    The unit must be in the cooling mode (compressor contactor Closed) before a fault condition can occur. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 46: Chapter 6 Maintenance

    Chapter 6 Maintenance Scheduled Maintenance Airxcel Commercial Group strongly recommends that the air conditioner be serviced a minimum of twice a year – once prior to the heating season and once prior to the cooling season. At this time the filters, evaporator coil, condenser coil, the cabinet, and condensate drains should be serviced as described below.
  • Page 47: Chapter 7 Warranty

    THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE-TO- STATE. Some states do not allow limitations or exclusions, so the above limitations and exclusions may not apply to you. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 48: Chapter 8 Start-Up Checklist

    Has water been placed in drain pan to confirm proper drainage? ❒Yes ❒No Are correct filters in place? ❒Yes ❒No Refrigerant Piping If leaks are found, report any leaks to Eubank Warranty Service Dept. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 49 L1 & L3 = 243 Volts = 717 / 3 = 239 Average Voltage L2 & L3 = 233 Volts 239 - 233 = 6 100 x 6/239 =2.5% Voltage Unbalance Three phase units only check fan & compressor rotation. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 50 Measured Line to Line Volts L1&L2_______V. L1&L3 ________V. L2&L3______V. (L1&L2 + L1&L3 + L2&L3)/3 = Avg. Voltage = _______________ Max. Deviation from avg. voltage = ______________volts Voltage imbalance = (100 x Max. Deviation)/avg. Voltage = ___________% Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 51 Evap. Leaving Air WB Temp ________ ________ Compressor Amps (L1) ________ ________ Compressor Amps (L2) ________ ________ Compressor Amps (L3) ________ ________ Notes: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 52: Installation Instructions For Field Installed Electric Heaters

    Note: The following instructions are for general guidance only. Due to the wide variety of installation possibilities, specific instructions will not be given. When in doubt, follow standard and accepted installation practices, or contact Airxcel Commercial Group for additional assistance. Wall Openings Measure the dimensions of the supply and return ports on the unit.
  • Page 53 15. Place the wiring diagram provided with the heater kit inside the zip lock bag which is affixed to the back side of the control box cover. 16. Replace the control box cover, the bottom front cover and the top front panel. Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...
  • Page 54 Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual 07/2021 Rev.3...

Table of Contents