Huawei BTS3902E WCDMA Installation Manual page 13

Hide thumbs Also See for BTS3902E WCDMA:
Table of Contents

Advertisement

BTS3902E WCDMA
Installation Guide
Figure 9-16 Installing the FE/GE fiber optic cable............................................................................................9-18
Figure 9-17 Tightening the round connector......................................................................................................9-19
Figure 9-18 Installing an optical module...........................................................................................................9-20
Figure 9-19 Installing the FE/GE Fiber Optic Cable ........................................................................................9-20
Figure 9-20 Installing the monitoring signal cable............................................................................................9-21
Figure 9-21 Loosening the screws from the housing.........................................................................................9-22
Figure 9-22 Moving the upper housing..............................................................................................................9-22
Figure 9-23 Installing the camouflage shell.......................................................................................................9-23
Figure 9-24 Tightening the screws.....................................................................................................................9-24
Figure 9-25 Closing the housing and tightening the screws..............................................................................9-25
Figure 9-26 BTS3902E power-on check procedure...........................................................................................9-27
Figure 9-27 Cable diagram on labels.................................................................................................................9-28
Figure 9-28 Leading the power cable through corrugated pipes .......................................................................9-29
Figure 9-29 Joining corrugated pipes ................................................................................................................9-29
Figure 9-30 Determining the length of the power cable ....................................................................................9-30
Figure 9-31 Stripping the specified length of the sheath and shield layer.........................................................9-30
Figure 9-32 Stripping the sheath off each core wire .........................................................................................9-30
Figure 9-33 Adding OT terminals......................................................................................................................9-30
Figure 9-34 Stripping the sheath off the FE/GE cable.......................................................................................9-31
Figure 9-35 Tightening the screws on a ground clip..........................................................................................9-31
Figure 9-36 Wrapping waterproof tape and PVC insulation tape .....................................................................9-32
Issue Draft A (2011-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figures
xi

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3902e

Table of Contents