Commissioning, inspection, maintenance
Further details regarding the individual steps
Note
If the control unit has not been
switched ON prior to filling the sys-
tem, then the servomotor of the
diverter valve will still be in its central
position, and the system will be com-
pletely filled.
Note
Lever on valve B must be in the
"l.h." position.
4. If the control unit had already been
switched ON before filling began:
Switch control unit ON and activate
filling program (see next steps).
Note
For function and details of the fill pro-
gram, see page 138.
24
(cont.)
5. Close boiler drain & fill valve A.
Activating filling function with
weather-compensated control units:
1. Press OK and
simultaneously for
approx. 4 s.
2. "Service functions"
3. "Filling"
4. Ending filling function:
Press OK or
.
Activating filling function with con-
stant temperature control units:
1. Press OK and
simultaneously for
approx. 4 s.
2. Select
"4" and confirm with OK.
The display shows "bF on" when the
filling function is activated.
3. Ending filling function:
Press
.