Download Print this page

Huawei AAU3940 Hardware Maintenance Manual page 21

Advertisement

AAU3940
Hardware Maintenance Guide
Step 7 Install AAU cables.
1.
2.
3.
Step 8 Set the corresponding circuit breaker on the power equipment for the AAU to ON.
Issue 01 (2015-01-15)
Figure 4-6 Installing an AAU on a pole top
Open the cover for the maintenance cavity of the AAU.
Reconnect cables to the AAU according to the previous record, and ensure that waterproof
blocks are inserted into vacant ports.
Close the cover for the maintenance cavity of the AAU.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Replacing an AAU
14

Advertisement

loading