Powering On The Router; Declaration Of Conformity - Huawei AR-Sc Series Quick Start Manual

Elevator gateways
Table of Contents

Advertisement

Power output cable: delivered with the UPS.
Power input cable: made onsite using the 2-pin terminal block delivered with the UPS.
The diameter of the cable must be 16-22 AWG.
MAIN
FXS
RS232
RS485
Eth0/WAN
Eth1
Eth2
Eth3
Power output cable

Powering On the Router

Before you power on the router, ensure the following:
1
The power cable has been properly connected.
The input voltage is within the normal range (12 V DC to 24 V DC).
Turn on the power switch of the external power supply system.
2
Check the PWR indicator on the front panel of the router.
3
PWR Steady green: The system power
supply is normal.

Declaration of Conformity

Hereby, Huawei Technologies Co., Ltd. declares that the radio equipment type
is in compliance with Directive 2014/53/EU.
The full text of the EU declaration of conformity is available at the following
internet address:
1
SIM
2
CAN
+
-
+
-
+
- TX RX
DI
DO
PWR
micro SD
www.huawei.com/en/product-certification.
OUTPUT: 12V;0.8A
DIV
Eth0/WAN
BLE/RST
11
12V GND RX TX
External power source
PWR
FXS
RS232-0 RS232-1
CAN-0
CAN-1
SIGNAL
DI
Eth1
Eth2
Eth3
CIL1
CIL2
CIL3
CIL4
L
N
Schindler

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents