Viessmann MatriX Service Instructions For Contractors page 30

Pressure-jet gas burner for the vitocrossal 300, type cm3 rated heating output 87 to 142 kw
Table of Contents

Advertisement

Flow diagram
Burner control unit flow diagram
Phase
Display Description
Relay test
"P"
Fan ramp-up for test
Safety relay test
Disable relays BV1 and BV2.
Relays test BV1 and BV2
Ignition relay test
Disable safety relay.
Start-up meter, initialisation
Standby
"0"
Standby
Start-up
"1"
Flame signal amplifier test
Gas fan and air pressure switch test
"2"
Fan ramp-up
"3"
Pre-purge
Adjusting start-up load, test WD 1
"4"
Pre-ignition
"5"
Ignition safety time
Flame detection safety time
Operation
"6"
Flame stabilising time
"7"
Start-up, partial load
Modulating operation
Adjust shutdown load.
Shutdown
"8"
Reheat, test WD 2
Fan ramp-up, post-purge
Post-purge
Waiting
"U"
Waiting for restart
"C"
Waiting for mains gas pressure
Fault
"9"
Forced ventilation fault
states
"10"
Flame tear-off
"11"
Safety shutdown
"F"
Fault shutdown
30
(cont.)
Duration
max. 20 s
0.9 s
0.9 s
0.9 s
0.9 s
0.9 s
0.1 s
0 ... s
max. 50 s
max. 20 s
max. 20 s
10 s
1.9 s
2 s
2.3 s
max.
0.51 s
15 s
20 s
0 to 24 h
0.1 s
min. 10 s,
max. 60 s
max. 20 s
10 s
1 min
5 min
20 s
0 ... s
0 ... s
0 ... s