2. INSTALLATION

2-1. Initial Inspection

This instrument was carefully inspected both mechanically and electrically before
shipment. It should be physically free of damage. To confirm this, the instrument
should be inspected for physical damage in transit. Also, check for supplied
accessories are present and correct.

2-2. Connecting AC Power

AC POWER OF THIS INSTRUMENT IS PRESET TO 115V OR 230V IN FACTORY
ACCORDING TO THE REQUEST OF CUSTOMER. BEFORE POWERING ON
THIS INSTRUMENT, CHECK AND MAKE SURE THE VOLTAGE OF THE
POWER SOURCE IS SAME WITH THE MARKING OF UNIT.
This instrument requires 230V AC or 115V AC (50-60 Hz) power socket with
protective earth contact (PE-contact). If is available only a power socket without
PE-contact (so a 2-conductor ac power) then a power socket with PE-contact must
be installed before or the appliance should be provided with a PE-screw-terminal
which is not soluble by hand and not soluble before 2-conductor power lines.

2-3. Cooling and Ventilation

No special cooling and ventilation is required. However, the instrument should be
operated where the ambient temperature is maintained.

2-4. Position

This instrument is built as a bench-type instrument with rubber feet and tilt stand
in place. Stand-up angle can be adjusted by rotating angle of carrying handle.

2-5. WARMING-UP

Allow more than 30 minutes for the unit to warm up so that it is stabilized and
ready for use.