Download Print this page

Mercury 200 Service Bulletin page 3

Hide thumbs Also See for 200:

Advertisement

Shift Shaft Alignment for 5.44 Inch Verado Gearcase Installation
IMPORTANT: The 5.44 inch Verado gearcase is not equipped with a neutral detent. Use this information to supplement the
current Verado service manual for gearcase installation.
1.
While rotating the propeller shaft in either direction, turn the shift shaft counterclockwise to engage the sliding clutch fully into
the gear. Note the position of the shift shaft.
2.
Turn the shift shaft clockwise to allow the propeller shaft to turn freely. While rotating the propeller shaft, turn the shift shaft
clockwise fully into gear. Note the position of the shift shaft.
3.
Rotate the shift shaft counterclockwise to the center location of the noted gear engagements. This is the neutral position.
4.
Rotate the propeller shaft to verify the neutral position. The propeller shaft will rotate freely in either direction.
5.
Install the shift shaft retainer assembly.
6.
Install the coupling onto the shift shaft.
THE INFORMATION IN THIS DOCUMENT IS CONFIDENTIAL AND PROTECTED BY COPYRIGHT AND IS THE PROPERTY OF MERCURY MARINE.
This document is provided for the sole and exclusive use of the original recipient as prescribed by Mercury Marine and may not be distributed or copied, digitally or otherwise,
without the prior written consent of Mercury Marine.
2011-01 APRIL 2011
c
a
b
46395
© 2011 Mercury Marine
provided by http://www.crowleymarine.com
Upgraded Gearcase Offering - Verado L6 Models
a -
Shift shaft
b -
Retainer assembly
c -
Coupling
Page 3 / 5

Advertisement

loading

This manual is also suitable for:

225250275300