Page 1
PRINTED IN USA COPYRIGHT 2021 P/N 990-30249 BRODERSON MFG. CORP. LENEXA, KANSAS 66215 OPERATION AND MAINTENANCE MANUAL IC-280-A OWNER:_______________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ SOLD AND SERVICED BY:________________________________________________________ ___________________________________________________________ ___________________________________________________________ MODEL NO. ___________________________ SERIAL NO. ______________________________...
Page 2
STATEMENT OF WARRANTY FOR MOBILE CRANES Broderson Manufacturing Corp. ("BMC") warrants its products to be free from defects in material or workmanship at the date of shipment from BMC. This warranty shall be effective only when validated by the return to BMC of its standard form of Warranty...
IC-280-A INDUSTRIAL CRANE INTRODUCTION The Broderson IC-280-A was designed and built to provide safe dependable and efficient crane service. This we warrant by our testing and quality control procedures. To properly utilize the full potential of the equipment, the following customer controlled conditions must exist: The operator must understand the equipment.
SECTION 1 DESCRIPTION AND SPECIFICATIONS The IC-280-A is a self-propelled Industrial Crane designed for material handling and maintenance and repair of equipment, with special features of self-loading cargo decks, 4-wheel steer, and 2-wheel drive. The basic unit consists of a chassis and hydraulic boom assembly. The chassis...
Page 9
General: (continued) Extension: W/O Boom Extension With Boom Extension Sheave Height (Nominal): 70 feet, 6 inches (21.49 m) 89 feet, 6 inches (27.27 m) Horizontal Reach: 59 feet, 9 inches (18.21 m) 79 feet, 10 inches (24.38 m) Weight: Total 41,340 pounds (18,752 kg) Front Axle 19,870 pounds (9013 kg)
Page 10
Hood for Diesel Engine Compartment The Tier 4 Final Cummins Engine package utilizes a sliding hood to access the engine bay. To open, lift and pull the hood towards the rear of the machine. When closing, push forward and when almost fully closed, lift the hood and push to fully close the hood.
Page 11
Calculated Performance: Gear Travel Speeds (MPH) Gradeability* Drawbar Pull 18,100 pounds (8200 kg) 10,600 pounds (4800 kg) 6,000 pounds (2700 kg) 3,200 pounds (1450 kg) Rear Axle: Optional 4-Wheel Drive: Planetary drive/steer axle with 15.78 to 1.0 ratio. Differential is not “limited slip” in rear axle. 1½°...
Page 12
Chassis: (continued) Pulling Eyes: Two heavy eyes in front bumper provide for attachment of snatch block, so auxiliary winch line can be used for pulling loads at or near floor level. Also for anchoring tag lines from load on hook. Tie Downs: Two, welded brackets underneath the rear, mid-section of the chassis, (in conjunction with the pulling eyes) provide tie down locations.
Page 13
Operator Compartment Options and Accessories: Operator Guard: (Not Available with Cab) Tubular steel weldment with heavy expanded steel mesh top section, bolts over the operator's compartment. Operator Guard is not designed, rated or certified as a Falling Objects Protection System (FOPS) or Rollover Protection System (ROPS). Net Weight: 60 pounds (27 kg) Operator Guard Door: Hinged door covers operator compartment side opening.
Page 14
Instrument Group: Located at operator's station, includes warning lights for low oil and transmission pressure, high coolant and transmission temperature, turn signals, high beams, hazard lights, parking brake and four-wheel-drive. Back-Up Alarm: Provides pulsating sound from a 102 dB alarm when ignition is on and transmission is in reverse.
Page 15
Boom Attachments: Standard: Anti-Two-Block Device: Prevents damage to hoist rope and/or machine components from accidentally pulling sheave block or downhaul weight against boom tip. Consists of trip arm at boom tip, which is moved upward by sheave block or downhaul weight as hook approaches boom tip.
OPERATION SECTION SAFETY RULES GENERAL: 1. Since the manufacturer has no direct control over machine application and operation, conformance with good safety practice is the responsibility of the user and his operating personnel. 4. The operator shall be responsible for those operations under his direct control. Whenever there is any doubt as to safety, the operator shall have the authority to stop and refuse to handle loads until safety has been assured.
Page 18
3. Keep operator's compartment and decks free of mud and grease. 4. If crane is equipped with a cab, keep all window glass clean. Keep gauges clean. 5. Tools, lubricants, or rags on the crane should be kept in a secured toolbox. 8.
LIFTING: 1. Always refer to Crane Capacity Chart in operator's compartment before handling load. Do not exceed load ratings. Under some conditions the standard capacity ratings cannot be recommended and must be adjusted downward to compensate for special hazards, such as weak supporting ground, wind, hazardous surroundings, operator inexperience, etc.
Page 20
9. Crane may tip at less than rated loads if the surface is uncompacted or if on wet dirt, or soft soil with frozen crust. Also avoid thin or cracked pavement, or a surface near a hole or ledge. Always use adequate outrigger floats and/or cribbing. See page 2-15. 10.The operator shall not leave the controls while the load is suspended.
Page 21
CAUTION Keep hands out of Anti-Two-Block mechanism. Serious injury can result from moving parts. 17. Avoid two-blocking. A. Stop raising hoist line before downhaul or hook block strikes boom tip plates. B. Pay out hoist line while extending boom. C. Maintain clearance between downhaul weight or hook block and boom tip while booming down.
22. Crane has four lifting rings, one at each corner of cargo deck, for lifting the crane. Use proper slings and rigging methods to keep the load balanced during the lift. Do not lift by the boom. Proper lifting and securing practices are the responsibility of the rigger in charge.
Page 23
2. When raising the boom or moving the unit with boom elevated, be sure there is adequate overhead clearance for boom. 3. For carrying loads on decks: A. Boom must be retracted, centered, and lowered as close as possible. B. 2 MPH (3 km/h) maximum road speed. Reduce speed below 2 MPH (3 km/h) to properly match condition of road surface and deck load stability.
INSTRUMENTS AND CONTROLS The IC-280 is equipped with an extensive instrument panel (detailed within the last two paragraphs). An hourmeter and a bubble level are also included in the instrument package. The ignition switch is key operated and has OFF, RUN and START positions. The ignition switch should always be turned off and the key removed when the vehicle is left unattended.
CONTROL VALVE FUNCTIONS The controls for operating the outriggers, boom rotation, boom elevation, boom extension and hoist are located along the forward dashboard area. The control handles are directly connected to the 3-position hydraulic valves. The placard located next to these handles identifies the function and direction resulting from each handle movement.
SEQUENCE OF OPERATION DRIVING THE VEHICLE The following procedure is recommended for driving the vehicle: Perform the daily inspection and test. (See Page 3-4) Apply park brake. Place transmission control lever in NEUTRAL. Start engine and allow a warming period. While warming the engine, set up the Rated Capacity Limiter configuration.
W A R N I N G Vapors can be formed inside fuel tank and cause buildup of pressure that can result in sudden expulsion of gasoline and gasoline vapors from the filler neck, when the fuel cap is removed from a hot tank. Remove cap slowly. Fuel spray may cause injury. RATED CAPACITY LIMITER (RCL) A rated capacity limiter is installed on the crane to assist the operator in estimating loads and measuring load radii.
W A R N I N G We recommend the CANCEL button and emergency override switch be used with discretion. Improper or careless use of this switch can cause damage to the crane and endanger people and property. The operator who uses these overrides in an emergency should use good judgment.
Page 29
W A R N I N G The Rated Capacity Limiter can suddenly stop the boom lower and swing functions, causing the load to bounce or swing. Use great care when handing a load near capacity limits or near a two-blocking condition. CRANE CAPACITY CHART DEFINITIONS AND RULES: The load radius is the horizontal distance from the centerline of boom rotation (the center of the turntable when it is level), to the vertical load line with the load suspended.
C A U T I O N A capacity load may be carried on the boom, or a capacity load may be carried on the deck, but not at the same time. The total of the percent of deck load and the percent of boom load must not exceed 100%.
SHEAVE BLOCK AND DOWNHAUL WEIGHT The capacity chart shows the approved hoist rope arrangements. The downhaul weight and sheave blocks supplied by Broderson are specially designed to operate the Anti-Two-Block system. Other blocks or downhauls may bypass this system and create a dangerous condition.
Page 33
MULTI-PART LINE REEVING For loads above 10,000 pounds (4536 kg) the sheave block must be used. The four-part-line sheave block can be used for loads up to 40,000 pounds (18,144 kg). The optional two-part- line sheave block can be used for loads up to 20,000 pounds (9072 kg). The wedge socket should be pinned to the wedge socket anchor, as shown in the figure.
SAFETY DEVICES There are certain safety devices on the IC-280 that are designed to maintain control of a load even though power or hydraulic line failure could occur. The operator should understand the function and operation of these devices, so that a continual check on their performance can be made.
OPTIONAL EQUIPMENT N O T I C E Use appropriate ladders/steps to gain access to the boom tip and deck to perform this installation. INSTALLING AND STOWING BOOM EXTENSION: Set the outriggers. Raise and extend the boom about 30 feet (9 m) above the ground, paying out load line until hook is just above ground.
Page 36
17. Lay the load line back in the boom tip sheaves and insert both retainer pins & cotters. 18. Replace all of the pins in their lugs for storage and insert their haipin cotters. 19. Install the sheave block on the load line, if desired. 20.
CAPACITY EXAMPLES FOR BOOM EXTENSION The BOOM EXTENSION LOAD RADIUS and BOOM EXTENSION ANGLE capacity charts must both be considered when using the boom extension. The smaller capacity specified by the two charts must be used. Refer to the Capacity Chart on page 2-14 for the following examples: In this first example the boom is elevated to 30°...
FRONT AUXILIARY WINCH: The front auxiliary winch is mounted behind the front bumper and is controlled from the operator compartment. The winch has 115’ (35 m) of 7/16” (11 mm) diameter 6x36 EIP- IWRC wire rope (20,200 pound (91 kn) minimum breaking force) and a 5-ton (4.5 metric ton) hook.
PINTLE HOOKS: Available Pintle Hooks allow the crane to tow other disabled vehicles and trailors, and drag loads. 1. Observe the capacity ratings marked near the hook when towing. 2. Exceeding the capacities can damage the drivetrain. 3. Use slow and smooth motions to avoid shock loads or overrunning loads. Make sure other vehicle is occupied and controlling the vehicle being towed.
SWITCH AND INDICATOR SYMBOLS ON BMC CRANES The following list shows the symbols used to label switches and indicators on BMC cranes. Most symbols are derived from the ISO 3767-1:1998(E) standard. Not all symbols will be included on your BMC crane. On/Start Windshield washer switch Off/Stop...
Page 41
Tire pressure Engine oil pressure low Lift point Engine coolant fill location Engine coolant Tie-down point temperature high Engine coolant low level Transmission oil fill location mark Engine air filter restriction Transmission oil pressure indicator Transmission oil Engine start temperature Brake fluid fill location Engine idle set Hydraulic oil low-level mark...
MAINTENANCE SAFETY RULES 1. Lower load and boom, shutdown engine, remove key, and put it in a safe place. Place warnings on the ignition switch and crane controls to prevent unauthorized starting or movement during maintenance. Disconnect battery when disabling crane. Disconnect battery, RCL and engine electronic module when welding on crane.
Page 44
16. Use a hoist when lifting components that weigh 50 pounds (22 kg) or more. Follow all hoist and rigging safety rules. 17. Do not use lower grade fasteners, if replacements are necessary. 18. When reinstalling wiring or plumbing after repairs, be sure that it will not be damaged by rubbing against sharp, rough, or hot surfaces or edges.
MAINTENANCE The Broderson IC-280 Industrial Crane will perform better and longer if a program of inspec- tion, lubrication, adjustment, and general preventive maintenance is followed. We recommend the following schedule: NEW UNIT INSPECTION AND TEST The following inspection and test should be made before placing the unit on the job. This will insure that no damage or loss of operating capability occurred during shipment.
OPERATOR INSPECTION AND TEST An operator, in the course of normal operation, should make certain observations, inspections and tests to assure that the unit is ready to perform safely. Daily: 1. Check levels of transmission fluid. 2. Check general condition of tires. 3.
Page 47
Weekly: 1. Check tire pressure: 120 PSI (827 kPa) 2. Check for loose wheel nuts. (500 foot-pounds (680 N-m) torque required.) 3. Check lights and turn signals. 4. Check power steering lines for damage. 5. Check brake lines for damage. 6.
IC-280 MAINTENANCE CHECKLIST Refer to the component maintenance section of this manual and to the engine operator's manu- al for complete instructions. 50-HOUR INTERVAL: 1. 50-hour lubrication, as shown on lube schedule. 2. Inspect wire rope thoroughly. 3. Inspect for physical damage and leaks. 4.
Page 49
500-HOUR OR 6-MONTH INTERVAL: 1. 250-hour maintenance. 2. 50, 250 and 500-hour lubrication. 3. Check antifreeze for protection level and cleanliness. 4. Change hydraulic filter element, if not changed in the last 250 hours and inspect oil from el- ement. 5.
BOOM CHAIN LUBRICATION Lubricate inner chains and chain sheaves through windows with boom fully extended and set horizontally. There are grease fittings on chain sheave shafts, both inside and outside the boom. Reach in through boom windows with a long tipped oil can, and spray chains & grease sheave fittings generously.
Use Mobil ATF Type F or equivalent. Transmission factory service manuals are availa- ble from Broderson. Order BMC Part Number: 990-00021. DRIVE AXLES--HUBS AND DIFFERENTIALS: Maintain lubricant to levels shown here with Mobil 424 or equivalent. Axle factory service man- uals are available from Broderson. Order BMC Part Number: 990-00020. 3-12...
WIRE ROPE LUBRICATION The wire rope should be cleaned and lubricated every 50 hours of normal operation and more frequently when used in dirty or corrosive environments. Whenever the rope is dirty or dry, it should be serviced. The rope should be cleaned with solvent and compressed air or solvent and rags.
Page 56
5. Position the hoist drum with the cable anchor on top. 6. Insert the cable through the anchor slot and wrap it around the anchor wedge. The end of the cable should extend past the wedge by about one inch (24 mm). 7.
HYDRAULIC SYSTEM The IC-280 hydraulic system consists of two sub-systems, driven by a double pump with a sin- gle inlet port. The 29-GPM (110 L/min) vane pump supplies the hydrostatic steering function and the boom & outrigger functions. The hoist and brake booster are powered by the 34-GPM (129 L/min) vane pump.
CARE OF HYDRAULIC OIL The hydraulic system contains many highly pressurized, precision components. To protect these, it is very important to keep the hydraulic oil clean, at proper temperature, within the oil specification, and to the proper fill level. The IC-280 is equipped with a 100-mesh suction strainer, a breather filter, a 10-micron return- line filter and a 54-gallon tank (204 L).
Page 60
HYDRAULIC OILS FOR IC-280 AMBIENT TEMP RANGE: -40° to 75°F -15° to 110°F 50° to 130°F (40° to 24°C) (26° to 43°C) (10° to 54°C) POUR POINT: -40°F MAX -15°F MAX 0°F MAX (-40°C) (-26°C) (-18°C) VISCOSITY INDEX: 140 MIN 95 to 100 95 to 100 VISC.
8. With the crane on outriggers, steer the crane wheels fully left and right three times in each steering mode. 9. Broderson uses multiple types of RCL computers. If the RCL computer is connected to the topping cylinder by hose, it may be necessary to bleed this hose. Perform the following: a.
HYDRAULIC SEALS W A R N I N G Do not check for hydraulic leaks with hands. If a mist of hydraulic oil is noticed around a line or component, use cardboard or other material to check for location of leak. High pressure fluid leaking from a small hole, can be almost invisible, yet have enough force to penetrate the skin.
PRESSURE SETTINGS: The hydraulic system is divided into two pressure circuits, each having its own protective ad- justable relief valve in the inlet sections of the control valve. The functions operated by the con- trol valve sections require different pressures for different functions. These are shown below: 1.
BOOM AND OUTRIGGER CIRCUIT: The relief valve pressure setting at the inlet for boom control sections is 3000 PSI (207 bar). This pressure is required for all but the swing control section. Two work port relief valves are installed in the swing section. These relief valves are set at 1500 PSI (103 bar). The relief pressure at the inlet end of the valve can be adjusted with a wrench and an Allen head wrench.
To determine whether the problem is in the left or right-hand cylinder, put a pressure gauge with a range of at least 5000 PSI (350 bar) on the ¼” size port on the side of one of the holding valves. W A R N I N G Disconnecting the RCL hose from a single holding valve may cause the boom to lower if the other holding valve is faulty.
BOOM CHAIN ADJUSTMENT Study Illustrations 1, 2, and 3 on the following page to understand the chain adjustment proce- dure. Proper adjustment is critical at time of boom assembly or scheduled maintenance. Initial adjustment: Retract boom completely. The 4 stage extension and retraction chains set the position of the 4 stage relative to the 3 stage.
ENGINE MAINTENANCE: Refer to the engine manual for engine maintenance. AIR CLEANER SERVICE: Diesel Engine: Check the air filter restriction indicator daily with the engine running. If the indicator is in the “Replace” zone, replace the primary and secondary filter. If the filter has not been changed for over 1000 hours, replace the filter regardless of the restriction indicator reading.
MECHANICAL ADJUSTMENTS FASTENERS: All fasteners on the IC-280 should be checked and retightened, if required, as a part of the pre- ventive maintenance program. Particular attention should be given to the drive axle mounting bolts, pump mounting bolts, pump drive shaft bolts, rotation bearing bolts, rotation gearbox bolts, and winch bolts.
PARK BRAKE TEST AND ADJUSTMENT: 1. Fully apply the parking brake. 2. Start the engine, retract the boom to the appropriate traveling position, and raise the outrig- gers. 3. Select 4th gear. 4. Push down hard on the foot brake pedal. 5.
Need help?
Do you have a question about the IC-280-A and is the answer not in the manual?
Questions and answers