International comfort products R9MSB0801716 Installation Instructions Manual page 29

Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
NOTE: Local codes may require a drain pan and condensate trap when a condensing furnace is installed over a finished ceiling.
Install 12" x 22" (204 x 559 mm) sheet metal in front of and above the burner compartment area.
The sheet metal MUST extend above the furnace casing by 1-in. (25 mm with the door removed.
A 1-in. (25 mm) clearance minimum between top of furnace and combustible material is required.
The entire length of furnace must be supported when furnace is used in horizontal position to
ensure proper drainage.
NOTE: FURNACE SHOWN IS A DIRECT-VENT APPLICATION. REFER TO THE VENTING SECTION FOR
ALLOWABLE VENT CONFIGURATIONS.
NOTE: Local codes may require a drain pan and condensate trap when a condensing furnace is installed over a finished ceiling.
440 01 6001 05
COMBUSTION - AIR PIPE
(SEE VENTING SECTION)
(51 mm)
ROLLOUT PROTECTION REQUIRED
Install 12" x 22" (305x559 mm) sheet metal in front of burner compartment
area. The sheet metal MUST extend underneath the furnace casing by 1-in.
(25 mm) with the door removed. The bottom closure panel may be used for
flame roll-out protection when bottom of furnace is used for return air connection.
Figure 30 − Working Platform for Attic Installation
ROLLOUT PROTECTION REQUIRED
Figure 31 − Suspended Furnace Installation
Specifications subject to change without notice.
2-IN.
COMBUSTION-AIR PIPE
(SEE VENTING SECTION)
2-IN.
(51 mm)
Gas Furnace: R9MSB
30 IN. (762 mm)
MIN. WORK AREA
A150580
A150581
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

B seriesA seriesR9msb

Table of Contents