International comfort products R80ESL Installation, Start-Up, Operating And Service And Maintenance Instructions
International comfort products R80ESL Installation, Start-Up, Operating And Service And Maintenance Instructions

International comfort products R80ESL Installation, Start-Up, Operating And Service And Maintenance Instructions

Single stage, multi-speed ecm, non–condensing gas furnace input capacities: 45,000 thru 155,000 btuh
Hide thumbs Also See for R80ESL:

Advertisement

Quick Links

R80ESN/R80ESL(Series A): Installation, Start-Up, Operating and Service and Maintenance Instructions
R80ESN/R80ESL(Series A)
Single Stage, Multi-Speed ECM,
Non-Condensing Gas Furnace
Input Capacities: 45,000 Thru 155,000 Btuh
Service and Maintenance Instructions
Use of the AHRI Certified TM Mark indicates a
manufacturer's participation in the program. For
verification of certification for individual products,
go to www.ahridirectory.org.
NOTE: Read the entire instruction manual before starting the
installation.
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
CODES AND STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
DURE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
AIR FOR COMBUSTION AND VENTILATION . . . . . . . . . . . . 5
Table 1 - Minimum Free Area Required for Each Combustion Air
Opening or Duct to Outdoors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Table 2 - Minimum Space Volumes for 100% Combustion, Ventila-
tion, and Dilution from Indoors . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
UPFLOW INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
DOWNFLOW INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . 8
Table 3 - Opening Dimensions - In. (mm) . . . . . . . . . . . . . . . . . . 9
HORIZONTAL INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . 9
AIR DUCTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
GENERAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . 11
SUPPLY AIR CONNECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . 11
Table 4 - Air Delivery - CFM (With Filter)* . . . . . . . . . . . . . . . 12
Table 5 - Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
GAS PIPING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Table 6 - Maximum Capacity of Pipe* . . . . . . . . . . . . . . . . . . . . 15
ELECTRICAL CONNECTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Table 7 - Electrical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
J-BOX RELOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
ACCESSORIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Installation, Start-Up, Operating and
VENTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
GENERAL VENTING REQUIREMENTS . . . . . . . . . . . . . . . . 20
Table 8 - Combined Appliance Maximum Input Rating
in Thousands of Btuh per Hour . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Table 9 - Minimum Allowable Input Rating of Space-Heating Appli-
ance in Thousands of Btuh per Hour . . . . . . . . . . . . . . . . . . . . . . 21
VENT CONNECTORS ©NFPA & AGA . . . . . . . . . . . . . . . . . . 22
GENERAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Table 10 - Altitude Derate Multiplier for U.S.A. . . . . . . . . . . . . 27
Table 11 - Orifice Size* and Manifold Pressure (In. W.C.) for Gas In-
put Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Table 12 - Orifice Size* And Manifold Pressure (In. W.C.) For Gas
Input Rate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Table 13 - Gas Rate (Cu Ft./Hr.). . . . . . . . . . . . . . . . . . . . . . . . . 29
SERVICE AND MAINTENANCE PROCEDURES. . . . . . . . . . . . 30
GENERAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
ELECTRICAL CONTROLS AND WIRING . . . . . . . . . . . . . . . 31
CARE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Table 14 - Filter Size Information (In. / mm) . . . . . . . . . . . . . . . 32
BLOWER MOTOR AND WHEEL. . . . . . . . . . . . . . . . . . . . . . . 32
CLEANING HEAT EXCHANGER . . . . . . . . . . . . . . . . . . . . . . 33
SEQUENCE OF OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
WIRING DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
TROUBLESHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
PARTS REPLACEMENT INFORMATION GUIDE . . . . . . . . . . . 39
CASING GROUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
ELECTRICAL GROUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
BLOWER GROUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
GAS CONTROL GROUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
HEAT EXCHANGER GROUP. . . . . . . . . . . . . . . . . . . . . . . . . . 39
INDUCER GROUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Portions of the text and tables are reprinted from current edition of NFPA
54/ANSI Z223.1E, with permission of National Fire Protection Association,
Quincy, MA 02269 and American Gas Association, Washington DC 20001. This
reprinted material is not the complete and official position of the NFPA or ANSI
on the referenced subject, which is represented only by the standard in its entirety.
1
Fig. 31
-
Fig. 43
. . . . . . . . . . . . . . . . . 25

Advertisement

Table of Contents
loading

Summary of Contents for International comfort products R80ESL

  • Page 1: Table Of Contents

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions R80ESN/R80ESL(Series A) Single Stage, Multi-Speed ECM, Non–Condensing Gas Furnace Input Capacities: 45,000 Thru 155,000 Btuh Installation, Start–Up, Operating and Service and Maintenance Instructions VENTING..........20 GENERAL VENTING REQUIREMENTS .
  • Page 2: Safety Considerations

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions SAFETY CONSIDERATIONS the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal WARNING injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage.
  • Page 3: Introduction

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions INTRODUCTION WARNING FIRE HAZARD Failure to follow this warning could result in personal injury, death and/or property damage. Do not install the furnace on its back or hang furnace with control compartment facing downward.
  • Page 4: Electrostatic Discharge (Esd) Precautions Proce

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions General Installation 6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from Current edition of the NFGC and the NFPA 90B. For copies, contact the damage.
  • Page 5: Location

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions LOCATION CAUTION GENERAL This multipoise furnace is shipped in packaged configuration. Some FURNACE CORROSION HAZARD assembly and modifications are required when used in any of the four Failure to follow this caution may result in furnace damage.
  • Page 6 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions b. Not less than the sum of the areas of all vent connectors in the The opening shall commence within 12” (300 mm) of the ceiling. space. Appliances in the space shall have clearances of at least 1” (25 mm) from the sides and back and 6”...
  • Page 7 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions 2. For fan-assisted appliances such as this furnace: a. There are no closeable doors between rooms. b. Combining spaces on same floor level. Each opening shall have free area of at least 1 in.
  • Page 8: Installation

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions INSTALLATION UPFLOW INSTALLATION Bottom Return Air Inlet These furnaces are shipped with bottom closure panel installed in bottom PLENUM return-air opening. Remove and discard this panel when bottom return OPENING air is used.
  • Page 9: Horizontal Installation

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 3 – Opening Dimensions - In. (mm) FURNACE PLENUM OPENING FLOOR OPENING CASING APPLICATION WIDTH Upflow Applications on Combustible or Noncombustible Flooring 12-11/16 21-5/8 13-5/16 22-1/4 (subbase not required)
  • Page 10: Location Relative To Cooling Equipment

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Leveling Legs (If Desired) Platform Furnace Support In upflow position with side return inlet(s), leveling legs may be used Construct working platform at location where all required furnace (see Fig.
  • Page 11: Air Ducts

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Roll-Out Protection Upflow and Horizontal Furnaces Provide a minimum 17-3/4 in. x 22 in. (451 mm x 559 mm) piece of Connect supply-air duct to flanges on furnace supply-air outlet. Bend sheet metal for flame roll-out protection in front of burner area for flange upward to 90°...
  • Page 12 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 4 – Air Delivery - CFM (With Filter)* Test Airflow Delivery @ Various External Static Pressures Wire Lead Furnace Function Color Gray Cooling. Do not use for heating. 1230...
  • Page 13 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 4 – Air Delivery - CFM (With Filter)* (Continued) Test Airflow Delivery @ Various External Static Pressures Wire Lead Furnace Function Color Gray Cooling. Do not use for heating.
  • Page 14: Gas Piping

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 5 – Dimensions VENT SHIP WT. LB. Unit Size CABINET WIDTH OUTLET WIDTH TOP AND BOTTOM CONNECTION (KG) BOTTOM FLUE INLET WIDTH SIZE COLLAR 0451412 14-3/16 (360) 12-9/16 (319)
  • Page 15 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions be installed immediately upstream of gas supply connection to furnace WARNING and downstream of manual equipment shutoff valve. NOTE: The furnace gas control valve inlet pressure tap connection is FIRE OR EXPLOSION HAZARD suitable to use as test gauge connection providing test pressure DOES NOT exceed maximum 0.5 psig (14-In.
  • Page 16: Electrical Connections

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions WARNING SUPPLY ELECTRICAL SHOCK AND FIRE HAZARD MANUAL Failure to follow this warning could result in personal injury, death, or SHUTOFF property damage. VALVE (REQUIRED) The cabinet MUST have an uninterrupted or unbroken ground...
  • Page 17 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions FIELD 24-V WIRING FIELD 115-, 208/230-, 460-V WIRING FACTORY 24-V WIRING FACTORY 115-V WIRING NOTE 2 THERMOSTAT FIVE WIRE FIELD-SUPPLIED TERMINALS DISCONNECT THREE-WIRE HEATING-ONLY 208/230- OR BLOWER DOOR SWITCH 460-V...
  • Page 18: J-Box Relocation

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions J-BOX RELOCATION NOTE: If factory location of J-Box is acceptable, go to next section (ELECTRICAL CONNECTION TO J-BOX). NOTE: On 14-in. (356 mm) wide casing models, the J-Box shall not be...
  • Page 19: Accessories

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions The 24-v circuit contains an automotive-type, 3-amp. fuse located on the 2. Humidifier (HUM) control. Any direct shorts during installation, service, or maintenance Connect an accessory 24 VAC, 0.5 amp. maximum humidifier (if could cause this fuse to blow.
  • Page 20: Notes For Thermostat Wiring Diagrams

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions NOTES FOR THERMOSTAT WIRING DIAGRAMS 1. Refer to outdoor equipment Installation Instructions for additional CHIMNEY INSPECTION CHART information and setup procedure. For additional requirements refer to the National Fuel Gas Code NFPA 54/ANSI Z223.1 and ANSI/NFPA 211 Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances 2.
  • Page 21: In Thousands Of Btuh Per Hour

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 8 – Combined Appliance Maximum Input Rating WARNING in Thousands of Btuh per Hour CARBON MONOXIDE POISONING HAZARD INTERNAL AREA OF CHIMNEY Failure to follow the steps outlined below for each appliance connected VENT HEIGHT FT.
  • Page 22: Exterior Masonry Chimney Fan + Nat Installations With Type-B Double-Wall Vent Connectors ©Nfpa & Aga

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Inspections before the sale and at the time of installation will determine CAUTION the acceptability of the chimney or the need for repair and/or (re)lining. Refer to the Fig. 30 to perform a chimney inspection.
  • Page 23 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions SIDEWALL VENTING An accessory Vent Guard Kit is REQUIRED for downflow applications where the vent exits through the lower portion of the furnace casing. See This furnace is not approved for direct sidewall horizontal venting.
  • Page 24 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions SEE NOTES: 1,2,4,5,7,8,9 SEE NOTES: 1,2,4,7,8,9 on the page following on the page following these figures these figures A03211 Fig. 33 – Downflow Application-Vent Elbow Up A03208 Fig. 36 – Upflow Application-Vent Elbow Up...
  • Page 25: Venting Notes For Fig. 31 - Fig

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions SEE NOTES: 1,2,4,5,7,8,9 A02068 Fig. 39 – Horizontal Right Application-Vent Elbow Left SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures A03214 Fig. 43 – Horizontal Left Application-Vent Elbow Right then Up VENTING NOTES FOR Fig.
  • Page 26 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions 1. Maintain 115-v wiring and ground. Improper polarity will result in WARNING rapid flashing LED and no furnace operation. 2. Make thermostat wire connections at the 24-v terminal block on the ELECTRICAL SHOCK HAZARD furnace control.
  • Page 27 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Adjustments 2. Determine the correct orifice and manifold pressure adjustment. There are two different orifice and manifold adjustment tables. All Furnace gas input rate on rating plate is for installations at altitudes up to models in all positions, except Low NOx models in downflow or 2000 ft.
  • Page 28 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 11 – Orifice Size* and Manifold Pressure (In. W.C.) for Gas d. Refer to Table 11 for cubic ft. of gas per hr. Input Rate e. Multiply gas rate (cu ft./hr) by heating value (Btuh/cu ft.) to obtain input.
  • Page 29: Input Rate

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 12 – Orifice Size* And Manifold Pressure (In. W.C.) For Gas 6. Set thermostat heat anticipator. a. Mechanical thermostat - Set thermostat heat anticipator to match Input Rate the amp. draw of the electrical components in the R-W circuit.
  • Page 30: Service And Maintenance Procedures

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Table 13 – Gas Rate (Cu Ft./Hr.) (Continued) b. Disconnect power to furnace and remove vent connector from furnace vent elbow. SIZE OF TEST SIZE OF TEST c. Restore power to furnace and set room thermostat above room...
  • Page 31: General

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions For Controls With an Amber LED WARNING The stored status code will not be erased from the control memory, if 115- or 24-v power is interrupted. ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD 1.
  • Page 32: Cleaning And/Or Replacing Air Filter

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions oil ports on each end of the motor. The following steps should be CAUTION performed by a qualified service agency. Clean blower motor and wheel as follows: CUT HAZARD 1. Turn off electrical supply to furnace.
  • Page 33: Cleaning Heat Exchanger

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions 1. Turn OFF gas and electrical power to furnace. CAUTION 2. Remove outer access door. 3. Disconnect vent connector from furnace vent elbow. UNIT DAMAGE HAZARD For downflow or horizontal furnace having an internal vent pipe, Failure to follow this caution may result in shortened heat exchanger remove internal vent pipe within the casing.
  • Page 34: Sequence Of Operation

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions speed, reversible electric drill; and a vacuum cleaner, clean cells as i. Install NOx baffles (if removed). follows: 14. Reinstall internal vent pipe, if applicable. a. Remove metal screw fitting from wire brush to allow insertion 15.
  • Page 35 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions seconds, the control CPU will close the gas valve GV, and the changes the timing sequence to avoid long blower off times during control CPU will repeat the ignition sequence for up to three...
  • Page 36: Wiring Diagram

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions WIRING DIAGRAM A190268 Fig. 50 – Wiring Diagram Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
  • Page 37: Troubleshooting

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions TROUBLESHOOTING A190024 Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
  • Page 38 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions A05032 Fig. 51 – Troubleshooting Guide Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
  • Page 39: Parts Replacement Information Guide

    R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions PARTS REPLACEMENT INFORMATION GUIDE CASING GROUP GAS CONTROL GROUP Outer door and Blower door Manifold Top filler plate Orifice Bottom filler plate Flame sensor Bottom enclosure Hot surface igniter Gas valve...
  • Page 40 R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions Edition Date: 03/20 Catalog No:441 01 6201 00 ©2020 International Comfort Products• 650 Heil Quaker Avenue, Lewisburg, TN 37091 Replaces:441 01 6200 02 Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

This manual is also suitable for:

R80esnA series

Table of Contents