19
Step 5: Connecting the Strings to a Combiner Box
For troubleshooting Power Optimiser operation problems, refer to Power Optimiser
Troubleshooting on page 57.
Proper Power Optimiser connection can also be verified in the Designer application.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/.
Step 5: Connecting the Strings to a
Combiner Box
For connecting the strings to the DC Safety Unit with glands using a single input
connection use a combiner box. The combiner box should reside between the modules
and the inverter.
Three Phase Inverter with SetApp Configuration