UTICA BOILERS UBSSC-299 Installation, Operation & Maintenance Manual page 21

Hide thumbs Also See for UBSSC-299:
Table of Contents

Advertisement

5 - HYDRONIC PIPING
FIGURE 5-8B Multiple Boilers Using Primary/Secondary Pumping with Closed External Primary Loop
12"/305mm Maximum Separation
12"/305mm
Existing closely spaced tees
Maximum
in primary system loop
Separation
CH/System
Pump
System
Size common piping
Temperature
per maximum heat
Sensor
capacity of entire system
Limit
length to
5' (1.6m)
All internal
primary loop ball
valves closed
3/8"/10mm Open
End Wrench may
be required to turn
valve
Up to 16
boilers
21
PN 240011320 Rev. G 10/01/2021]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ubssc-075Ubssc-100Ubssc-150Ubssc-200Ubssc-050

Table of Contents