UTICA BOILERS UBSSC-299 Installation, Operation & Maintenance Manual page 20

Hide thumbs Also See for UBSSC-299:
Table of Contents

Advertisement

FIGURE 5-8A Multiple Boiler Using Primary Secondary Two Pipe Zoned System With Zone Valves
CH/System
Pump
5 - HYDRONIC PIPING
DHW
Pump
12"/305mm Maximum Separation
Temperature
Up to 16
boilers
(See Multiple Boiler Guide)
20
System
Sensor
Size common piping
per maximum heat
capacity of entire
system
Limit
length to
5' (1.6m)
All internal
primary loop ball
valves closed
3/8"/10mm Open
End Wrench may
be required to turn
valve
PN 240011320 Rev. G 10/01/2021]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ubssc-075Ubssc-100Ubssc-150Ubssc-200Ubssc-050

Table of Contents