Plug Connection; Connection Via Terminal Strip - ebm-papst G2E140-AG02-05 Operating Instructions Manual

Table of Contents

Advertisement

G2E140-AG02-05
Heating-up of the motor when using a variable frequency drive must be
checked by the customer following installation in the end device.

4.3 Plug connection

4.3.1 Making supply connections
; Check your connector's pin assignment.
; Connect the built-in connector with the mating connector.
; Ensure that the connector is properly engaged.

4.4 Connection via terminal strip

4.4.1 Connecting wires to terminals
WARNING
Live terminals and connections even with device
switched off
Electric shock
→ Wait five minutes after disconnecting the voltage at all poles
before opening the device.
; Insert the wires into the terminals, see
Chapter 4.5 Connection diagram.
Item no. 11283-5-9970 · ENU · Change 202174 · Approved 2018-12-28 · Page 7 / 10
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com
Operating instructions

Advertisement

Table of Contents
loading

Table of Contents