Plug Connection - ebm-papst R2E220-AA44-98 Operating Instructions Manual

Table of Contents

Advertisement

R2E220-AA44-98

4.3 Plug connection

4.3.1 Preparing cables for connection
The cables, including the customer interface, are subject to the
specifications for internal wiring.
Ensure conformity with applicable standards and check the
degree of protection in the final product after installing the ebm-
papst device.
; Connect the cables to the mating connectors.
4.3.2 Making supply connections
; Check your connector's pin assignment.
; Connect the built-in connector with the mating connector.
; Ensure that the connector is properly engaged.
Item no. 11544-5-9970 · ENU · Change 202174 · Approved 2019-01-03 · Page 8 / 11
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com
Operating instructions

Advertisement

Table of Contents
loading

Table of Contents