Download Print this page

Supra TRAC-Vault BT Installation Instructions page 2

Advertisement

2
Rendered Wall Installation:
1. While holding the vault in the desired position on
the wall, locate the four mounting holes away from
mortar lines and the edge of the wall.
2. Using a marker, trace the location of all four
mounting holes. (Refer to Figure 1)
3. Using a drill with an 8 mm masonry drill bit, drill each
hole to a depth of 105 mm.
4. Verify each hole aligns with the four holes in the
back of the vault.
5. Clean out the debris from all four holes.
6. Insert one of the HECO mounting screws onto the
chain mounting bracket. (Refer to Figure 2)
7. Place the TRAC-Vault up to the wall (drain hole
down) and insert each mounting screw all the way
through the mounting holes in the vault, with the
chain mounting bracket in the lower left hole.
8. Tighten all four screw heads in the order shown
in Figure 1 until they are flush with the back of the
vault, and behind the vault lip.
9. Using the appropriate driver, tighten all four screws
into the wall a little at a time until all four screws are
secure and the vault is tight against the wall.
Through-the-Wall Installation:
This method was not tested to LPS 1175: Issue 7 SR2.
1. Before drilling, verify no interference will occur with
any plumbing, electrical, fire or security systems, etc.
2. Once the location for the unit has been decided,
level the template on the wall and mark the holes for
drilling. (Refer to Figures 1 and 5)
Figure 5. Side view, TRAC-Vault BT installed through the wall
TRAC-Lid BT
Lid chain
attachment
Lock washer
Nut
TRAC-Vault
Vault
chain bracket
Drain hole
Figure 3. Optional Tamper Switch
AMP FDVH-187C
quick connector
14/16 AWG wire
Figure 4. Installed TRAC-Lid
TRAC-Vault
Tamper switch
adjustment screw
1 Normally open
2 Normally closed
3 Common
To alarm
Indicator
light
TRAC-Lid BT
Thumb lever
Wall
Back plate
All-thread rod
Nut
Lock nut
Fender washer

Advertisement

loading