Download Print this page

Vestil MEZZ-KD-88T-93D Manual page 8

Knock-down mezzanine gate systems

Advertisement

Table of Contents
INSTALLING THE GATE SYSTEM
Select a location for the mezzanine gate system that is close to the edge of the upper level. Move the assembly
into position and anchor it to the surface by installing
each post mounting bracket. The length of the anchor bolts should be determined by a qualified and trained
individual such as your building engineer.
Upper level
Lower level
Table of Contents
Rev. 9/28/2020
3
/
" flat washers and anchor bolts through the 4 bolt holes in
8
Bottom gate
Copyright 2020 Vestil Manufacturing Co.
Top gate
Post mounting
Side
gate
Post mounting bracket
MEZZ-KD MANUAL
bracket
3
/
"
8
anchor
bolt
Page 8 of 10

Advertisement

loading

This manual is also suitable for:

Mezz-kd-88t-93d-aMezz-200-dwMezz-200-dw-ss