Download Print this page

Vestil MEZZ-KD-88T-93D Manual page 7

Knock-down mezzanine gate systems

Advertisement

Table of Contents
Step 4: Connect the rotation support brackets (3) to
the side gates with bolts (11) and lock nuts (12). The
upper bolt inserts through the bolt hole in the handrail;
the two lower bolts insert on either side of the gate
post.
Handrail
Gate
post
Step 6: Connect the pivoting assembly (completed in step 3) to the shoulder bolts (10) and installed in step 5.
Apply lock nuts (12) to the ends of the shoulder bolts.
Table of Contents
Rev. 9/28/2020
Upper bolt
Lower
bolt
(3)
(11)
Copyright 2020 Vestil Manufacturing Co.
Step 5: Install shoulder bolts (10) and spacers (8) through
the remaining bolt holes in the support brackets (3).
Handrail
Shoulder bolt
MEZZ-KD MANUAL
Spacer
Spacer
Lock nut
Page 7 of 10

Advertisement

loading

This manual is also suitable for:

Mezz-kd-88t-93d-aMezz-200-dwMezz-200-dw-ss