Download Print this page

Vestil MEZZ-KD-88T-93D Manual page 6

Knock-down mezzanine gate systems

Advertisement

Table of Contents
ASSEMBLING THE GATE SYSTEM
At least 2 people should work together to assemble this gate system. Numbers in parentheses () correspond to
item numbers in the bills of materials on p. 4 & 5.
Step 1: Install the side gates (1). As shown in the
diagram, determine the necessary clear width of the
aisle (measured between inside edges of mounting
brackets). Secure the gates to the surface with
flat washers and anchor bolts of appropriate length
as determined by your building engineer. Orient the
gates so that the bolt holes in the top rails are at the
same end. The bolt holes should also be opposite
the edge of the mezzanine.
Clear width
Clear
width
Step 3: Attach braces (2) and gussets (5 & 6) with carriage bolts (9) and lock nuts (12).
Table of Contents
3
/
in.
8
+ 4"
(1)
Copyright 2020 Vestil Manufacturing Co.
Rev. 9/28/2020
Step 2: Determine the width the gates need to be. Cut
2"x4" lumber appropriately. The length of each plank
7
should be 6
/
" more than the clear width you selected in
8
step 1. Fasten each plank to the 2 gate frame pieces (4)
with 2 rail support brackets (7) and 4 sets of carriage
bolts (11) and lock nuts (12). Use a 7/16" drill to make
bolt holes in the planks.
Detail view
(11)
2"x4"
(7)
(12)
plank
Lock nut (12)
Brace (2)
End gusset (5)
MEZZ-KD MANUAL
(4)
Detail view
(11)
(12)
Bolt (9)
End gusset (5)
Center
gusset(6)
Page 6 of 10
(7)

Advertisement

loading

This manual is also suitable for:

Mezz-kd-88t-93d-aMezz-200-dwMezz-200-dw-ss