Drolet HeatPack DF00500 Installation And Operating Instructions Manual page 31

Table of Contents

Advertisement

HeatPack Furnace Installation and Operation Manual
Step 3.
Pre drill the two top RTD probe support holes with a 1/8" drill bit in the furnace
plenum. Secure it in place with two screws (C).
Step 4.
Install the RTD probe (N) in its support and secure it in place with 2 screws (C).
Plug the RTD probe in the connector located at the back of the furnace.
31

Advertisement

Table of Contents
loading

Table of Contents