HeatPack Furnace Installation and Operation Manual
Step 3.
Pre drill the two top RTD probe support holes with a 1/8" drill bit in the furnace
plenum. Secure it in place with two screws (C).
Step 4.
Install the RTD probe (N) in its support and secure it in place with 2 screws (C).
Plug the RTD probe in the connector located at the back of the furnace.
31