PLATFORM
Picture 1
Before placing the platform above the telescopic pole, make sure that the lift is in level with
the appropriate level in the top of the telescopic pole (in case of difficulty, proceed to adjust the mechanical
feet again). Once leveled, hook the platform and screw to lock it. the platform of the two models of lift is
equipped with integrated removable supports. These supports are convenient and facilitatethe installation of air
conditioners against the wall (such as Picture 1 and 2).
REMOVE THE LIFT
1. Unplug the lift from the current.
2. Remove the platform.
3. Fold the feet.
PROBLEM
By pressing the joystic button the pole
doesn't move but the motor runs.
The motor is not working.
The pole will not lift a weight more than
20kg.
IN CASE OF FAILURE
CONTROL
Control that the red emegency button is
not pressed. Even if the extraction of the
emergency stop is not complete, the only
solution is to operate manually.
The power plug is not correctly plugged.
In this case control the switch position. If
it's not in the "up" position, move it, in this
manner the pole can go down. After the
complete descent, leave the switch in the
"up" position. The load will raise again.
Picture 2
SOLUTION
In case you're not able to extract the red
emergency button: with one hand press
slightly the joystic command and with
the other hand rotate the emergency
button and pull it. This maneuver doesn't
affect the hoister but permit to release
the gearbox.
In the event the motor is faulty, contact
immediately your seller or the service
company.
Be sure that the switch is always in the
"up"position and continue working with
the hoister.
19
Need help?
Do you have a question about the smart clima 11100203 and is the answer not in the manual?