Download Print this page
Viavi G4-Apex-ENTERPRISE-HW Hardware Installation

Viavi G4-Apex-ENTERPRISE-HW Hardware Installation

Advertisement

Quick Links

G4-Apex-ENTERPRISE-
HW
Hardware Installation
30 Apr 2021

Advertisement

loading
Need help?

Need help?

Do you have a question about the G4-Apex-ENTERPRISE-HW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Viavi G4-Apex-ENTERPRISE-HW

  • Page 1 G4-Apex-ENTERPRISE- Hardware Installation 30 Apr 2021...
  • Page 2 1.   For SFP, the SFP may be any of Copper 10/100/1000, 1Gb SX/LX. For SFP +, the SFP+ may be any of 10Gb SR/LR. For QSFP+, the QSPF+ may be any 40Gb SR/LR/BiDi/Universal. For QSFP28, the QSFP28 tranceivers may be SR4, LR4, or BIDI. 2 — © 2021 Viavi Solutions (30 Apr 2021)
  • Page 3 Mount the appliance in your cabinet. Refer to the instructions on VIAVI Rail Kit (page 7). Do not remove the drives from the chassis. Connect the cables. ●...
  • Page 4 Ensure the time zone settings match your environment. 10. Double-click the Observer icon on the Desktop to start Observer. Your hardware appliance is installed and on your network. 4 — © 2021 Viavi Solutions (30 Apr 2021)
  • Page 5: Configuring Your System

    Configuring your system Click OK again to close the Properties dialog for that There are a number of items to do to get your system on your network connection. network and ready to use. You interact with the hardware appliance through the Apex UI. Startup and shutdown Navigate to https://hostname where hostname is the IP There are several procedures to turn on or off your system.
  • Page 6 To receive Syslog messages, change the settings at ● Configuration > Syslog. You configured the IPMI port and changed the default password. You may have also configured your system to send alerts when certain situations arise. 6 — © 2021 Viavi Solutions (30 Apr 2021)
  • Page 7 Repeat for the other inner rail. Do not pick up the server by the front Caution: handles. They are designed to pull the system from a rack only. Align the chassis rails with the front of the rack rails. 7 — VIAVI Rail Kit...
  • Page 8 Support hours are 7:00 A.M. to 7:00 P.M. CST/CDT (for North and South America) and 8:00 A.M. to 5:00 P.M GMT (EMEA and APAC). 8 — © 2021 Viavi Solutions (30 Apr 2021)