Daikin FTXZ09NV1S Service Manual page 18

Table of Contents

Advertisement

Electrical Box / PCBs
Step
6. Remove the limit switch.
Unfasten the 4 hooks
1
and remove the cover.
Remove the limit
2
switch.
7. Remove the signal
receiver / display PCB.
Remove the display
1
unit from the filter
cleaning unit.
Remove the 2 screws
2
on the back of the
display unit.
Remove the streamer
3
duct and the mounting
plate.
Unfasten the 5 hooks of
4
the signal receiver /
display PCB.
16
Procedure
Limit switch
Hook
Cover
Hook
Display unit
Streamer duct
Mounting
plate
Hook
Hook
Points
(R19860)
(R19861)
(R19862)
(R19863)
Removal Procedure
Si041411E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents