Download Print this page

Troubleshooting - Novellini R90 base p.80 Instructions For Installation, Use And Maintenance Manual

Advertisement

PRODUCT GUARANTEE:
All products purchased by consumers, as defined in
Article 3 of the Consumer Code (Legislative Decree
no. 206 of 6 September 2005 and subsequent
amendments), are covered by the legal guarantee
of the seller under Article 128 and subsequent
amendments of the consumer Code. In case of lack
of conformity of the product, we invite the consumer
to contact their dealer within the statutory deadline.
WATER TREATMENT
• The hardness of the domestic water supply affects
the operation and the cleaning frequency of the
thermostatic mixer and boiler unit.
• In case of water with hardness above 15°f an antiscale
device is recommended. The choice of device should
be made according to the characteristics of the
water supply.
This symbol indicates important product
instructions or important safety information.
IMPORTANT:
Before you start to assemble and install the product,
carefully read through all the instructions. Unpack the
components and check that nothing is missing and
that there are no damaged or faulty components,
remove the transparent protective film. Before
you install the shower cubicle in its final position,
perform a test run. Run the unit for several minutes
and check for water leaks and any damage caused
during transport and handling. This product should
be installed by suitably skilled personnel.
N.B.: This product is designed for installation on
finished walls and floors.
Warranty claims must be produced with the purchase
invoice and the product assembling instructions.
The drawings and illustrations in this manual are
provided for information purposes only.
The manufacturer reserves the right to make changes
and improvements without prior notice.
Electrical connection:
The manufacturer certifies that the product
conforms to current health and safety regulations
at the time of sale and that the product has the CE-
mark and Declaration of Conformity. All products
and components are tested during manufacture in
accordance with the relevant reference standards
and company quality system procedures. In order
to ensure that your manufacturer product maintains
these high standards after installation and throughout
its service life, please read the following instructions.
1) Check that the mains electrical equipment
connected to cubicle conforms to current electrical
standards and regulations and is fitted with a fully
efficient earth connection.
2) Current electrical regulations forbid the installation
of any electrical equipment (e.g. plugs, switches)
inside a radius of 60 cm from the cubicle and at a
height of 225 cm.
3) Check that rating of the mains power supply line
matches the absorbed power specified for the
cubicle (see Technical specifications).
4) The electrical connection between the cubicle and
the mains must be protected against water spray
and must have a protection rating of IP55 or higher.
5) The electrical equipment upstream from the
cubicle must be fitted with an omnipolare 30 mA
switched circuit breaker with a minimum contact
opening of 3 mm, which conforms to current
electrical regulations.
6) The manufacturer declines all responsibility for
injury or damage resulting from failure to observe
these instructions..
1
~
Dismantling the shower valves:
In the event of the formation of lime scale and a
resulting malfunctioning of the shower valves,
dismantle the parts (fig. A/B/C...). We recommend you
immerse the cartridge in normal vinegar until it is
completely lime scale-free.
To ensure correct operation of the thermostatic mixer,
the unit must be supplied from a boiler or a water
heater providing 6 to 7 litres per minute of water at a
temperature of 60/65°C.
INSTRUCTIONS FOR USE:
electrocution Hazard. Do not use electrical
equipment of any type inside the shower
enclosure when the shower is operating.
PRECAUTIONS:
Integrated cubicles will provide a variety of benefits
if used properly. You should observe the following
precautions.
1) Do not exceed a maximum water temperature of
45°C.
2) Do not use the shower or the steam bath after a
heavy meal and while you are still digesting.
3) Do not exceed the maximum load of the seat (120
kg).
4) Children and the infirm should only use the cubicle
under the supervision of an adult.
5) Do not use the steam bath for longer than 20 to 30
minutes. Maximum permitted steam bath times
vary with age and body weight.
6) Persons with serious heart problems, high blood
pressure and acute illnesses should consult a
medical practitioner before using the steam bath.
7) SCALDING HAZARD. During a steam bath, keep
your feet away from the steam outlet nozzle.
CLEANING THE SHOWER UNIT:
CARING FOR YOUR CUBICLE
The cubicle panels are made with acrylic parts and
must be cleaned using a liquid detergent and a soft
cloth or sponge. Use a good quality household liquid
detergent. To prevent scale deposits, wipe dry using a
chammy leather or a soft lint-free cloth that removes
stubborn deposits without leaving traces. Limescale
deposits may be removed using specific detergent
products. To restore shine to the acrylic surface polish
with an ordinary wax polish such as car wax. DO NOT
USE ABRASIVE CLEANERS, ALCOHOL OR ALCOHOL
BASED PRODUCTS, ACETONE OR OTHER SOLVENTS.
45
Liquid soap
600 mm
2400 mm
2

TROUBLESHOOTING:

Before calling the Service Centre, check that:
3
(I)
• The hoses are properly connected and not kinked.
• Hot and cold water is being correctly delivered to
the wall fittings.
• The water supply system was bled before the shower
unit was installed.
• The mains power supply is reaching the steam
generator and the green Power On LED on the
control panel is lit.
WASTE DISPOSAL:
For the disposal of the product or its parts, follow
the local regulations on matters of waste disposal.
For Italy, Legislative Decree n. 152 of April 3, 2006
will hold, and for the other EU countries, Directive
2008/98/EC.
EC DECLARATION OF CONFORMITY:
The manufacturer Opus Engineering S.r.l. via Mantova,
1023, 46030 Borgo Virgilio (MN) Italy declares under
its responsibility that the cubicle fitted with steam
generator mod. S 300 conforms with the following
European directives EEC 2006/99, EEC 2004/108
as amended EEC 92/31, EEC 93/68 and with the
following European standards:
EN62233
EN55014-1
EN55014-2
EN60335-1
EN60335-2-15
EN61000-3-2
EN61000-3-3
EN61000-4-2
EN61000-4-3
EN61000-4-4
EN61000-4-5
EN61000-4-6
EN61000-4-11
ENGLISH
Romanore di Borgo Virgilio, lì 31.10.2008
Opus Engineering S.r.l.
Alberto Filipponi
Amministratore delegato

Advertisement

loading