Download Print this page

Pilot Set Pressure Field Test Procedure - Pentair ANDERSON GREENWOOD 95 POSRV Maintenance Instructions Manual

Advertisement

ANDERSON GREENWOOD TyPE 95 POSRV
MAINTENANCE INSTRUCTIONS
6.0 PILOT SET PRESSURE FIELD TEST PROCEDURE (REFER TO FIGURE 6)
This procedure is for measuring the pressure where the valve will open. It will not
measure where the valve closes. To measure the closing pressure, use the procedure in
Section 5.0.
6.1
Remove the pilot discharge tube from the pilot and replace with a cap that has
a .06" diameter [1.5 mm] hole in it.
6.2
Connect the test equipment to the field test valve.
6.3
With the metering and vent valve closed, open the gas bottle and adjust the
regulator pressure to about 200 psi [14 kp/cm
6.4
Open the field test valve. Slowly open the metering valve and observe the test
gauge. Increase the pressure until gas flow at the pilot discharge fitting increases
rapidly. The pressure at which this occurs is the set pressure of the valve.
6.5
To adjust the opening pressure turn the spring adjusting screw under the
cap/adapter "IN" to increase pressure or "OUT" to decrease pressure.
6.6
The IMO (International Maritime Organization) Rule set pressure tolerances are:
+ 10%
0 - 21.3 psi [0 - 1.5 kp/cm
+ 6%
21.3 - 42.7 psi [1.5 - 3.0 kp/cm
+ 3%
42.7 psi or 3.0 kp/cm
FIGURE 6
Auxiliary setter
Unscrew here
for removal
(install hand-tight only –
lubricate threads)
Pilot
discharge
fitting
Pilot
discharge
tube
Type 95 pilot recommended field test set-up
2
].
]
2
]
2
and above
2
Auxiliary set
pressure
adjustment
under cap
Primary set
pressure
adjustment
under cap
Bonnet
vent
Pilot
Field
test
valve
Main valve
Test gauge
Metering
valve
High
pressure
hose
Vent
valve
Adapter fitting to
/
" NPT port on
1
2
field test valve
Engineering Doc. #05.9040.083 Rev. E
Copyright © 2013 Pentair
Nitrogen
bottle with
shutoff
valve and
regulator
ANGMC-6026-US-1312
page 9

Advertisement

loading