Technical Data - Baxi Assure Vertical SHRU Installation & Maintenance Manual

Waste water heat recovery unit

Advertisement

2.1
General Data
Description
Material internal tube
Min. mains water pressure
Mains water connections
Weight
Water content – secondary
2.2
Components & Dimensions (Fig. 1)
4
1. Product Body
2. Tee Piece 45°
3. Cap - Cleaning Access Ø50
4. 45° Elbow Ø50 - 2 off
5. Adaptor - Ø50 to Ø43 - 2 off
6. Reducer - Male 3/4" to Female 1/2" (inc. cap) - 2 off
7. 90° Elbow - Female Ø50/Female Ø50
8. Mounting Bracket - 2 off
9. Installation & Maintenance Manual
10. SAP Label
Baxi Assure SHRU
Installation
In addition it is strongly recommended to obtain two suitable
SAP Label
isolation valves to be installed on the mains inlet & pre-heated outlet
pipework. These will enable isolation of the unit from the mains
water circuit in the event of replacement.
Fig. 1
2.0

Technical Data

Unit
mm
mm
mm
L/m
bar
bar
ºC
inch
mm
kg
Litres
Value
1650
1800
80
SS 316L
PVC
10
1
60
3/4" - 1/2"
43
8
0.9
Vert SHRU