General Information - Trane CGCL 200 Installation Operation & Maintenance

Air cooled water chiller with centrifugal fans
Table of Contents

Advertisement

©American Standard Inc. 2006

General information

Foreword
These instructions are given as a
guide to good practice in the
installation, start-up, operation, and
maintenance by the user, of Trane
CGCL chillers. They do not contain
full service procedures
necessary for the continued
successful operation of this
equipment. The services of a
qualified technician should be
employed through the medium of a
maintenance contract with a
reputable service company. Read
this manual thoroughly before unit
start-up.
Units are assembled, pressure
tested, dehydrated, charged and run
tested before shipment.
Warnings and cautions
Warnings and Cautions appear at
appropriate sections throughout this
manual. Your personal safety and the
proper operation of this machine
require that you follow them
carefully. The constructor assumes
no liability for installations or
servicing performed by unqualified
personnel.
WARNING! : Indicates a potentially
hazardous situation which, if not
avoided, could result in death or
serious injury.
CAUTION! : Indicates a potentially
hazardous situation which, if not
avoided, may result in minor or
moderate injury. It may also be
used to alert against unsafe
practices or for equipment or
property-damage-only accidents.
Safety
recommendations
To avoid death, injury, equipment or
property damage, the following
recommendations should be
observed during maintenance and
service visits:
1. The maximum allowable pressures
for system leak testing on low and
high pressure side are given in the
chapter "Installation". Always
provide a pressure regulator.
2. Disconnect the main power supply
before any servicing on the unit.
3. Service work on the refrigeration
system and the electrical system
should be carried out only by
qualified and experienced
personnel.
CGCL-SVX01B-E4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents