Page 1
® DEL UV® SPA UV SANITIZER INSTALLATION INSTRUCTIONS & PRODUCT MANUAL THE COMPLETE MODERN SPA® C-M-P.COM/SPA-SANITIZERS IMPORTANT SAFETY INFORMATION: READ AND FOLLOW ALL INSTRUCTIONS Save these instructions. Leave manual with homeowner after installation. Improper installation, adjustment, alteration, service, or lack of maintenance can cause injury or property damage. Read the installation, operating, &...
Page 2
IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS Read this manual completely before attempting installation. All permanent electrical connections should be made by a qualified electrician. Follow all applicable electrical codes. When installing the DEL UV® Spa, basic precautions should always be followed: Be sure the electrical power is shut OFF at the main circuit breaker DANGER before installing the DEL UV®...
Use the two mounting holes located internally on the back panel of the DEL UV Spa (Figure 1). b. Mount the DEL UV Spa to the spa frame with #8 hardware. The preferred mounting orientation is shown in Figure 2. Connect water inlet at the bottom.
3. Plumbing Make appropriate water tight connections on both the inlet and outlet of the DEL UV Spa. Water flow may be in either direction. Temporarily apply power to the spa and start the spa circulation system to check for and repair any water leaks. Disconnect power to...
Verify that there is no power to the spa and connect the DEL UV Spa cord to the mating connector(s) on the spa controller. b. Where possible, route the DEL UV Spa power cord away from other electrical lines. Avoid routing the power cord parallel to any low- voltage signal wires.
Make sure the unit is disconnected from power and the lamp has cooled before starting maintenance. Open the DEL UV Spa by removing the two front screws and loosening the two enclosure screws on the upper enclosure assembly. Pull the cover from the enclosure base.
Any water remaining in the system above the level of the NOTICE DEL UV Spa will flow out of the UV housing once the lamp retainer is removed. iv. Grasp the inside of the quartz tube and pull it out of the housing.
SECTION 2 Maintenance Instructions vii. After cleaning the quartz tube, wash it off with water and wipe dry with a soft towel. viii. Make sure the inside of the quartz tube is dry before installing the UV lamp. 6E. Quartz Tube Installation Place the sealing ring on the quartz tube 3/4 inch from the open end.
Record Information on this System Below & Keep for Your Records Installer ______________________________________________________________ System Purchased From _____________________________________________ Installation Date _____________________________ Serial Number _______________________________ Model Number ______________________________ CMP Customer Service & Tech Support Toll Free: 1-800-733-9060 FAX: 770-632-7115 support@c-m-p.com Warranty Questions RMA@c-m-p.com...
Need help?
Do you have a question about the DEL UV SPA and is the answer not in the manual?
Questions and answers