Calibration - UCS C-SV 20A User Manual

Smoke extraction / weather control unit
Table of Contents

Advertisement

Available languages

Available languages

USER MANUAL
USER MANUAL
EN
EN
All the electrical connections, including the main power supply, must reach the control unit through the dedicated cover.
For that purpose, proceed as follows:
E
Remove the fixing holes from cover "E".
Each cable must be inserted into the control unit through a dedicated cable gland (not included).
Connect the power supply cable to the dedicated terminal on
the power supply unit.
Connect the black cable to the battery.

7.3 Calibration

In this phase, the control unit is powered so the most careful attention should be paid.
The calibration must be carried out only when the control unit is on its final configuration.
Once the installation has been completed and all connections (including those related to the
batteries and mains power supply) have been formed, the yellow LED will stay lit on the con-
trol unit (red and greed LEDs off), to indicate that calibration of the test circuitry on the motor
outputs is required. Check that the control unit and the motors are working correctly, and then
push the CAL button on the board. If no errors, faults, or emergencies are detected, the control
unit will go into STANDBY mode, which is indicated by only the green LED switching on and
staying on.
Doc. 85860I - Rev. 22/10/2020
7
Drill holes on the cover according to the
amount of cables to be connected.
14/54
E
F
8
Reposition cover "E" on the box equipped
with gasket "F".
9
Drw. / Dis. 33942/h

Hide quick links:

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C-SV 20A and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

C-sv ib 20a

Table of Contents