Actions In Emergency; Servicing; General Requirements; Conservation - Neurosoft Neuron-Spectrum-1 Technical Manual

Table of Contents

Advertisement

Neuron-Spectrum (Technical Manual)

3.4. Actions in Emergency

In the cases of electrical insulation disturbance of any digital EEG system component
which causes the emergency (fire, mechanical failure, flood, medical staff evacuation)
and threat of patient or staff electrical shock, it is necessary to de-energize the digital
EEG system completely.
4.

Servicing

4.1. General Requirements

Safety measures when servicing conforms to the ones described in the chapter 3
"Proper Use".
Qualification requirements to the medical staff are listed in chapter 2.1 "Requirements
to the Personnel Conducting Systems Installation".
Servicing of the bought articles included in the digital EEG system is conducted
according to user and technical manuals or typical rules.
When detecting the troubles it is recommended to use the information given in
"Troubleshooting" section. If the troubles can't be eliminated using digital EEG system
control units or by restart, it should be switched off and checked by the specialist.
Type, volume and periodicity of the servicing except specified in this chapter, are not
determined.
The delivery set check is done by conformity to the device packing report.
4.2. Servicing
Digital EEG system servicing in the process of operation includes the external
examination, check of connectors and cables, removal of contaminations from the
units' surface using wet fabric.

4.3. Conservation

The digital EEG system components including accessories and operational
documentation should be packed in separate plastic sachets and then placed in a
firm-manufacturer package.
28

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Neuron-Spectrum-1 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents