Black & Decker Prise Pfister KENZO RT6 Series Manual page 3

4 hole roman tub trim kit
Hide thumbs Also See for Prise Pfister KENZO RT6 Series:
Table of Contents

Advertisement

Available languages

Available languages

THICK WALL INSTALLATION
6
6F
6D
6E
6 DIVERTER INSTALLATION
From above deck, place Washer (6A) and slide and thread Diverter Body (6B) into Main
Body (6C). Be sure to position Diverter Body (6B) with Set Screw Hole (6D) facing
tub. Secure Diverter Body (6B) with Set Screw (6E). Thread Rod (6F) into Diverter
Body (6B).
7
7C
7 SPOUT INSTALLATION
Place Lower Base (7A) over Diverter Body (7B). Assemble and align Quick Connect
Spout (7C) onto Diverter Body (7B) and tighten Set Screw (7D). Place Button (7E).
STOP
6B
6A
6C
7E
7D
7A
7B
Go To Step 10
ENGLISH
THIN WALL INSTALLATION
8
8C
8 SPOUT INSTALLATION
Place Lower Base (8A) over Diverter Body (8B). Assemble and align Quick Connect
Spout (8C) onto Diverter Body (8B) and tighten Set Screw (8D). Place Button (8E).
9
9A
9 KNOB INSTALLATION
Place Knob (9A) onto Diverter Stem (9B) and tighten Set Screw (9C) as shown. Make
sure Set Crew (9C) is securely tighten to Knob (9A).
For pressure testing: Seal Spray Hose (9D) with Plug (9E) (Supplied with Rough-In
0X6-44). Run water and perform pressure test. Look for leaks.
WARNING: Pressure testing is not to exceed 250 PSI (1724 kPa). Make sure
pressure is balanced between hot and cold inlets.
WARNING: Differential pressure of hot and cold inlets must not exceed 100
PSI (689 kPa).
CAUTION: Slowly remove Plug (9E) to relieve pressure.
3
8E
8D
8A
8B
9C
9E
9B
9D

Advertisement

Table of Contents
loading

Table of Contents