Installation - Abus Profiline AZ6450 Installation And Operating Instructions Manual

Gsm-interface
Table of Contents

Advertisement

Available languages
  • EN

Available languages

6
Connection for voltage supply from
power supply unit (14,5 V DC/ 0,8 A)
7
Backup power supply (lead battery
(12 V DC / 1.2 Ah)
8
Socket for AZ6451 voice module
(optional)
9
J10: connection for software
programming cable
10
LEDs for GSM status (voltage, GSM,
battery low)

7. Installation

IMPORTANT:
-
Install the device in a dry, protected place away from other radio and
electromagnetic devices.
-
Make sure there is a power supply of 230 V AC near the installation
location.
1.
Open the casing by removing the fixing screws and then removing the
front cover.
2.
Use the base plate as drilling template for the four fixing holes at the
corners of the housing.
3.
Drill the holes marked and insert wall plugs if necessary.
4.
Pull the connection cables through the cable guides.
5.
Screw the housing to the selected surface.
6.
Screw the antenna supplied to the top of the housing.
7.
Connect the battery (12 V/1.2 Ah) for the backup power supply.
8.
After installing and programming, lock the housing.
16
GSM antenna
17
Connecting clamps for the
telephone connections (parallel-
switched to telephone socket)
LINE: analogue telephone line
SET: external devices
18
Socket for external devices
(alarm system, external telephone,
etc.)
19
Socket for analogue telephone
line (PSTN)
20
J15: Jumper for addressing inputs
(see 8.2 Inputs)
NR (default) = negative
triggering
PR = positive triggering
6

Advertisement

Table of Contents
loading

Table of Contents