5.14 High demand single occupancy application:
Where single properties have a much higher demand, it may be necessary to
use additional Mainsboost vessels connected in parallel to ensure sufficient
water is on tap to meet the much higher demand. Fig. 6 shows all vessels
being located in the same place.
Fig. 6
5.15 Water softener:
Note: If a water softener is to be fitted it must be located between the
upstream line-in kit and the vessel. If high pressure is also required to the
drinking tap fit a Stuart Water Conditioner, available from Stuart Turner, rather
than a water softener.
Fig. 7
UPSTREAM
LINE-IN KIT
Water softener
- 10 -
Need help?
Do you have a question about the MAINSBOOST MB 100CV and is the answer not in the manual?